FDOT Long Range Estimating System - Production R3: Project Details by Sequence Report
Project: 444843-1-22-01
Letting Date: 01/2099
Description: US 41/SR 55 from US 301/SR63 at 9th Street East to north of 25th Street East
District: 01 County: 13 MANATEE Market Area: 10 Units: English
Contract Class: 4 Lump Sum Project: N Design/Build: N Project Length: 4.512 MI
Project Manager: NEM-AEH-SAA
Version 2 Project Grand Total $732,268,758.02
Description: March 2026 GFT Markups from Version 1-3/24/26
Sequence: 1 WDU - Widen/Resurface, Divided, Urban Net Length: 4.512 MI 23,823 LF
Description: 6-lane alternative with elevated two-way managed lanes
EARTHWORK COMPONENT
User Input Data
User Input Data
DescriptionValue
Standard Clearing and Grubbing Limits L/R25.00 / 25.00
Incidental Clearing and Grubbing Area0.00
Alignment Number1
Distance0.831
Top of Structural Course For Begin Section102.00
Top of Structural Course For End Section102.00
Horizontal Elevation For Begin Section100.00
Horizontal Elevation For End Section100.00
Existing Front Slope L/R6 to 1 / 6 to 1
Existing Median Shoulder Cross Slope L/R4.00 % / 4.00 %
Existing Outside Shoulder Cross Slope L/R2.00 % / 2.00 %
Front Slope L/R6 to 1 / 6 to 1
Median Shoulder Cross Slope L/R4.00 % / 4.00 %
Outside Shoulder Cross Slope L/R2.00 % / 2.00 %
Roadway Cross Slope L/R2.00 % / 2.00 %
Pay Items
Pay itemDescriptionQuantity UnitUnit PriceExtended Amount
110-1-1CLEARING & GRUBBING27.35 AC$25,267.69$691,071.32
120-2-2BORROW EXCAVATION, TRUCK MEASURE7,377.80 CY$30.06$221,776.67
Earthwork Component Total $912,847.99
ROADWAY COMPONENT
User Input Data
DescriptionValue
Number of Lanes6
Existing Roadway Pavement Width L/R24.00 / 24.00
Structural Spread Rate165
Friction Course Spread Rate80
Widened Outside Pavement Width L/R45.00 / 45.00