( ) 1 - FREEWAY
( ) 2 - RESTRICTIVE w/Service Roads
3 - RESTRICTIVE w/660 ft. Connection Spacing
( ) 4 - NON-RESTRICTIVE w/2640 ft. Signal Spacing
( ) 5 - RESTRICTIVE w/440 ft. Connection Spacing
( ) 6 - NON-RESTRICTIVE w/1320 ft. Signal Spacing
( ) 7 - BOTH MEDIAN TYPES
CRITERIA
NEW CONSTRUCTION / RECONSTRUCTION
( ) RESURFACING (LA FACILITIES)
( ) RRR (ARTERIALS & COLLECTORS)
POTENTIAL EXCEPTIONS AND VARIATIONS RELATED TO TYPICAL SECTION:
DESIGN VARIATIONS 1. BORDER WIDTH
| CURRENT YEAR | = 2024 AADT = 65,000 |
|---|
| ESTIMATED OPENING YEAR | = 2030 AADT = 71,800 |
|---|
| ESTIMATED DESIGN YEAR | = 2050 AADT = 99,900 |
|---|
| K = 7.5% D = 57% T = 8.0% (24 HOUR) |
| DESIGN HOUR T = 4.0% |
| DESIGN SPEED = 45 MPH |
| POSTED SPEED = 45 MPH |
| TARGET SPEED = 40 MPH |
SR 55 (US 301 / US 41)
MP. 3.552 TO MP. 3.788
CONVENTION CENTER ENTRANCE TO 7TH STREET EAST
| FINANCIAL PROJECT ID | SHEET NO. |
|---|
| 444843-1-22-01 | 6 |
THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.