PROJECT CONTROLS TYPICAL SECTION No. 01

CONTEXT CLASSIFICATION

() C1 : NATURAL () C3C : SUBURBAN COMM.

() C2 : RURAL () C4 : URBAN GENERAL

() C2T : RURAL TOWN () C5 : URBAN CENTER

  • C3R : SUBURBAN RES. () C6 : URBAN CORE
  • () N/A : L.A. FACILITY
  • FUNCTIONAL CLASSIFICATION
  • () INTERSTATE () MAJOR COLLECTOR
  • () FREEWAY/EXPWY. () MINOR COLLECTOR
  • PRINCIPAL ARTERIAL () LOCAL
  • THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.
  • () MINOR ARTERIAL
  • HIGHWAY SYSTEM
  • () NATIONAL HIGHWAY SYSTEM
  • () STRATEGIC INTERMODAL SYSTEM
  • STATE HIGHWAY SYSTEM
  • () OFF-STATE HIGHWAY SYSTEM
  • ACCESS CLASSIFICATION
  • () 1 - FREEWAY
  • () 2 - RESTRICTIVE w/Service Roads
  • 3 - RESTRICTIVE w/660 ft. Connection Spacing
  • () 4 - NON-RESTRICTIVE w/2640 ft. Signal Spacing
  • () 5 - RESTRICTIVE w/440 ft. Connection Spacing
  • () 6 - NON-RESTRICTIVE w/1320 ft. Signal Spacing
  • () 7 - BOTH MEDIAN TYPES
  • CRITERIA
  • NEW CONSTRUCTION / RECONSTRUCTION SR 55 (US 301 / US 41) MP. 2,255 TO MP. 2617
  • () RESURFACING (LA FACILITIES)
  • () RRR (ARTERIALS & COLLECTORS)
  • POTENTIAL EXCEPTIONS AND VARIATIONS
  • RELATED TO TYPICAL SECTION:
  • DESIGN VARIATIONS
  • BORDER WIDTH TRAFFIC DATA

CURRENT YEAR = 2024 AADT = 33,100 ESTIMATED OPENING YEAR = 2030 AADT = 33,700 ESTIMATED DESIGN YEAR = 2050 AADT = 41,800 K = 7.5% D = 37% T = 8.0% (24 HOUR) DESIGN HOUR T = 4.0% DESIGN SPEED = 45 MPH POSTED SPEED = 40 MPH TARGET SPEED = 40 MPH

FINANCIAL PROJECT ID SHEET NO.

444843-1-22-01 2