PROJECT CONTROLS TYPICAL SECTION No. 07

CONTEXT CLASSIFICATION

() C1 : NATURAL (X) C3C : SUBURBAN COMM.

() C2 : RURAL ( ) C4 : URBAN GENERAL

() C2T : RURAL TOWN ( ) C5 : URBAN CENTER

() C3R : SUBURBAN RES. ( ) C6 : URBAN CORE

() N/A : L.A. FACILITY

FUNCTIONAL CLASSIFICATION

() INTERSTATE ( ) MAJOR COLLECTOR

() FREEWAY/EXPWY. ( ) MINOR COLLECTOR

F FICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C

  • PRINCIPAL ARTERIAL ( ) LOCAL
  • () MINOR ARTERIAL
  • HIGHWAY SYSTEM
  • () NATIONAL HIGHWAY SYSTEM
  • () STRATEGIC INTERMODAL SYSTEM
  • STATE HIGHWAY SYSTEM
  • () OFF-STATE HIGHWAY SYSTEM
  • ACCESS CLASSIFICATION
  • () 1 - FREEWAY
  • () 2 - RESTRICTIVE w/Service Roads
  • 3 - RESTRICTIVE w/660 ft. Connection Spacing
  • ( ) 4 - NON-RESTRICTIVE w/2640 ft. Signal Spacing
  • 6/10/2026 9:05:44 AM USER: jsarullo c: ransvstems\pw local ransvscorp-pw1\d1549582\TYPDRDO
  • ( ) 5 - RESTRICTIVE w/440 ft. Connection Spacing
  • ( ) 6 - NON-RESTRICTIVE w/1320 ft. Signal Spacing
  • ( ) 7 - BOTH MEDIAN TYPES
  • CRITERIA
  • NEW CONSTRUCTION / RECONSTRUCTION

() RESURFACING (LA FACILITIES)

( ) RRR (ARTERIALS & COLLECTORS)

POTENTIAL EXCEPTIONS AND VARIATIONS RELATED TO TYPICAL SECTION:

TRAFFIC DATA: TRAVEL LANES TRAFFIC DATA: MANAGED LANES

CURRENT YEAR = 2024 AADT = 47,000 ESTIMATED OPENING YEAR = 2030 AADT = 47,100 ESTIMATED DESIGN YEAR = 2050 AADT = 47,600 K = 7.5% D = 57% T = 8.0% (24 HOUR) DESIGN HOUR T = 40% TARGET SPEED = 40 MPH DESIGN SPEED = 45 MPH POSTED SPEED = 45 MPH CURRENT YEAR = 2024 AADT = ESTIMATED OPENING YEAR = 2030 AADT = 43,600 ESTIMATED DESIGN YEAR = 2050 AADT = 49,600 K = 7.5% D = 57% T = 0.0% (24 HOUR) DESIGN HOUR T = 0.0% TARGET SPEED = 45 MPH DESIGN SPEED = 45 MPH POSTED SPEED = 45 MPH

FINANCIAL PROJECT ID SHEET NO.

444843-1-22-01 8