PROJECT CONTROLS TYPICAL SECTION No. 06

CONTEXT CLASSIFICATION

C1 : NATURAL (X) C3C : SUBURBAN COMM.

C2 : RURAL ( ) C4 : URBAN GENERAL

C2T : RURAL TOWN ( ) C5 : URBAN CENTER

C3R : SUBURBAN RES. ( ) C6 : URBAN CORE

N/A : L.A. FACILITY

FUNCTIONAL CLASSIFICATION

INTERSTATE ( ) MAJOR COLLECTOR

FREEWAY/EXPWY. ( ) MINOR COLLECTOR

PRINCIPAL ARTERIAL ( ) LOCAL

MINOR ARTERIAL

HIGHWAY SYSTEM

NATIONAL HIGHWAY SYSTEM

STRATEGIC INTERMODAL SYSTEM

STATE HIGHWAY SYSTEM

OFF-STATE HIGHWAY SYSTEM

ACCESS CLASSIFICATION

1 - FREEWAY

2 - RESTRICTIVE w/Service Roads

3 - RESTRICTIVE w/660 ft. Connection Spacing

4 - NON-RESTRICTIVE w/2640 ft. Signal Spacing

5 - RESTRICTIVE w/440 ft. Connection Spacing

6 - NON-RESTRICTIVE w/1320 ft. Signal Spacing

7 - BOTH MEDIAN TYPES

CRITERIA

NEW CONSTRUCTION / RECONSTRUCTION

RESURFACING (LA FACILITIES)

RRR (ARTERIALS & COLLECTORS)

POTENTIAL EXCEPTIONS AND VARIATIONS

RELATED TO TYPICAL SECTION:

TRAFFIC DATA: TRAVEL LANES TRAFFIC DATA: PROPOSED EXPRESS LANES

CURRENT YEAR = 2024 AADT = 55,000 ESTIMATED OPENING YEAR = 2030 AADT = 58,800 ESTIMATED DESIGN YEAR = 2050 AADT = 63,200 K = 7.5% D = 57% T = 8.0% (24 HOUR) DESIGN HOUR T = 4.0% TARGET SPEED = 40 MPH DESIGN SPEED = 45 MPH POSTED SPEED = 45 MPH CURRENT YEAR = 2024 AADT = ESTIMATED OPENING YEAR = 2030 AADT = 43,600 ESTIMATED DESIGN YEAR = 2050 AADT = 49,600 K = 7.5% D = 57% T = 8.0% (24 HOUR) DESIGN HOUR T = 0.0% TARGET SPEED = 45 MPH DESIGN SPEED = 45 MPH POSTED SPEED = 45 MPH

FINANCIAL PROJECT ID

SHEET NO. 444843-1-22-01 7

FICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE 61G15-23.004, F.A.C.