Site and structure requirements, including:
Stormwater management plan;
Stormwater pollution prevention plan;
Erosion and sediment control plan;
All Data Center production equipment (computers, servers, etc.) shall comply with Building Code requirements. Said structure(s) shall be placed on a permanent foundation.