WATER Pollution Ordinance Language JACKSON County Iowa
The applicant shall identify the proposed method of sanitary sewage disposal and potable water supply for the facility, including whether the facility will use an existing system, proposed private well, public or municipal water service, hauled water, or another lawful source. Any required County Health Department or state agency review shall be coordinated under Section 8.
5
The applicant shall submit a preliminary stormwater, grading, drainage, and erosion-control plan prepared by a qualified professional, identifying existing and proposed drainage patterns, impervious surface, stormwater facilities, erosion-control measures, sediment-control measures, and any required state or federal stormwater permits.
F. Greater Setback May Be Required.
The Board of Adjustment may require greater setbacks where site conditions, topography, facility design, cooling technology, water-use characteristics, or other site-specific factors indicate that additional distance is necessary to protect public health, safety, and welfare, to achieve compliance with Section 6 of this ordinance, or to prevent adverse impacts to groundwater, surface water, or hydrologically sensitive features.