When the tugs arrive at the facility's jetty the waste containers are unloaded by two goliath gantry cranes and placed on the back of dock tractors and trailers.
These vehicles deliver the waste containers into the tipping hall of the plant and also take containers of Incinerator Bottom Ash from the facility back to the jetty for onward processing and recycling at Tilbury.
The Energy from Waste Process
1. The waste bunker is 30m deep, 61m long and 16m wide. It can hold up to around 10,000 tonnes of waste – enough to fuel the whole plant at full capacity for five days.