Tampa Bay Florida Department of Transportation
US 19 Repaving from South of Tampa Road to South of Live Oak Street 451287-1-52-01
Project Details
Work TypeRepaving
PhaseCompleted
Limitsfrom south of Tampa Road to south of Live Oak Street
Project StartJanuary 5, 2026
Length6 Miles
CityPalm Harbor Tarpon Springs
CountyPinellas
RoadUS 19
Construction Cost$8.5 million
Estimated CompletionFall 2026
ContractorPreferred Materials, Inc.
About
As of September 15, 2026, all construction activities associated with this project have been completed.
The project will repave US 19 from south of Tampa Road to south of Live Oak Street in Pinellas County.
This project also includes the installation of upgraded ADA features and facilities as needed.
Construction is anticipated to be complete in fall 2026.