Schedule and product confirmation

Field survey and shop drawings: _____ calendar days after notice to proceed.

Equipment delivery: ___ weeks after approved submittals.

Installation and testing: ___ calendar days.

Maximum continuous elevator outage: ___ calendar days.

Proposed start: ___ Final completion: ___

Meets County required completion date: [ ] Yes [ ] No

Warranty period: ___ Service phone: ___

Component groupManufacturer and model offered
600 Series cab / wall panels / ceiling__________
Car doors / ventilation / rails__________
Recessed car operating station / indicator__________
Rath phone / emergency communication__________
Sling and platform / ELSCO B guides__________
Sill / toe guard / data plate__________

Attach detailed technical data for all components, including items not individually listed above. For an approved equivalent, identify the approving addendum: ___

Certifications and signature

The undersigned is authorized to bind the bidder and offers to perform the complete base scope for the stated price, or that scope as modified by County acceptance of the submitted DA-1 credit. The bidder acknowledges the published owner-work allocation and all addenda, has had an opportunity to inspect the site, and has included required costs without unapproved exclusions or conditions. The bidder will execute the published agreement and provide required insurance and a 100% performance and payment bond if awarded the work. This proposal was independently prepared without collusion.

Authorized signature: ___ Date: ___

Printed name / title: ___

Bidder state of residence: ___

If nonresident, attach applicable resident-preference information required by Iowa law.

Attachment check: [ ] Technical data [ ] Schedule / approach [ ] Licenses / registration

[] Experience / references [] Subcontractors [] Insurance commitment [] Bid security