Field survey and shop drawings: _____ calendar days after notice to proceed.
Equipment delivery: ___ weeks after approved submittals.
Installation and testing: ___ calendar days.
Maximum continuous elevator outage: ___ calendar days.
Proposed start: ___ Final completion: ___
Meets County required completion date: [ ] Yes [ ] No
Warranty period: ___ Service phone: ___
| Component group | Manufacturer and model offered |
|---|
| 600 Series cab / wall panels / ceiling | __________ |
|---|
| Car doors / ventilation / rails | __________ |
|---|
| Recessed car operating station / indicator | __________ |
|---|
| Rath phone / emergency communication | __________ |
|---|
| Sling and platform / ELSCO B guides | __________ |
|---|
| Sill / toe guard / data plate | __________ |
|---|
Attach detailed technical data for all components, including items not individually listed above. For an approved equivalent, identify the approving addendum: ___
The undersigned is authorized to bind the bidder and offers to perform the complete base scope for the stated price, or that scope as modified by County acceptance of the submitted DA-1 credit. The bidder acknowledges the published owner-work allocation and all addenda, has had an opportunity to inspect the site, and has included required costs without unapproved exclusions or conditions. The bidder will execute the published agreement and provide required insurance and a 100% performance and payment bond if awarded the work. This proposal was independently prepared without collusion.
Authorized signature: ___ Date: ___
Printed name / title: ___
Bidder state of residence: ___
If nonresident, attach applicable resident-preference information required by Iowa law.
Attachment check: [ ] Technical data [ ] Schedule / approach [ ] Licenses / registration
[] Experience / references [] Subcontractors [] Insurance commitment [] Bid security