Attachment A Project technical schedule

The completed technical schedule and listed design documents form part of this RFP. Requirements in this attachment supplement Sections 3 and 4, including Section 4A.

Item to confirmCounty issued requirement or reference
Elevator location855 Central AVE North Elevator
Cab floor finish and substrateProvide standard flooring
Handrail and bumper rail locations and quantitiesADA compliant around the entire cab
Operating station controls and security interfacesNew recessed station.
Position indicator and retained controls interfaceNew in base bid; compatible existing device may be offered under DA-1.
Emergency phone model and communication functionsNew Rath phone in base bid; preserve two-way visual communication. compatible existing device may be offered under DA-1.
Door operator interface and retained equipmentRetain previously modernized door operator and protective screen; verify new cab / door compatibility.

Design documents issued with this RFP

List document title, preparer, date, and revision below; attach the listed documents to the issued package. If no separate design documents are required, record the County's confirmed determination. [DOCUMENT REGISTER]

The equipment schedule in Sections 3 and 4 remains part of the scope. Changes to that scope must be identified expressly. Provide the same completed attachment and drawings to all bidders.