Ellucian Ethos Integration Essentials Scope of Work
Service Description
EngagementHigh Level TasksDeliverables
Planning and TurnoverTechnical kickoff, service preparation call, service readiness validation, and training for Ethos Integration and Ellucian ERP Middleware component installation.• Planning Call • Engagement Agenda • Service Preparation Document • Training Materials • Engagement Report
Ethos Integration – Functional IntegrationConfigure the Ellucian ERP in preparation for the Ethos Integration implementation. Configure Ellucian Ethos Data Model mappings.• Decision Workbook • Configured Mappings
Ethos Integration – Technical IntegrationEllucian will: • Deploy or upgrade the Ellucian Messaging Adapter to the latest supported version; and • Configure the Ellucian ERP for the integration required for the Ethos Integration implementation. Ellucian will configure the Client Ethos Integration Tenant to the authoritative source (Ellucian ERP).
Ethos Integration – Technical ValidationEthos Integration message flow validation from Ethos Integration to the Ellucian ERP and validation from the Ellucian ERP to Ethos Integration.• Validate 1 non-production environment • Installation Report
Client Responsibilities
Provide a designated non-production environment representative of the intended production environment for deployment of the integration that is available for Ellucian to have access and required privileges for the duration of the engagement;
Provide the appropriate resource(s) to assist with deployment of integration components and execute the test plan in the same designated non-production environment, and provide timely system support as needed to maintain operation and availability of the designated non-production environment;
Develop and deliver test plan; and
Provide test data entered to the designated non-production environment per the test plan.
Banner Student API
Banner Integration API
Banner Common Database Upgrade
Banner Ethos API DB Upgrade
SSL configuration with a certificate from a well-known certificate authority for the Banner Student API
Ellucian Messaging Service
Banner Events Publisher
Ellucian Ethos Integration Requirements
Banner Events Publisher Requirements
Tomcat 7.x with Java 7/Tomcat 8.x with Java 8 or WebLogic base domain with Oracle Database 11g (Java 7 or 12c with Java 7 or 8)
If you have Ellucian CRM Recruit, or planning to purchase Ellucian CRM Recruit note that BRIM requires WebLogic and is not supported on Tomcat as Tomcat does not support JMS
Ellucian Messaging Service Requirements
BEP must be 100% functioning and tested in the production and the non-production environment
Banner Events Publisher