Southwest Florida
Florida Department of Transportation
| Project Details |
| Work Type | Resurfacing |
|---|
| Phase | Construction |
|---|
| Limits | Old Scenic Highway to S.R. 544/C.R. 544 |
|---|
| Project Start | Late 2026 |
|---|
| Length | 5.4 miles |
|---|
| City | Dundee |
|---|
| County | Polk |
|---|
| Road | SR 17 |
|---|
| Construction Cost | $3.2 million |
|---|
| Estimated Completion | Early 2027 |
|---|
Contact Information
Communications Team
Sandra Mancil
863-519-4116
Sandra.Mancil@dot.state.fl.us
Project improvements include:
Remove the top layer of asphalt and replace with new asphalt
Pave side street entrances and some driveway entrances
Add high-emphasis crosswalk striping at Frederick Avenue, Kokomo Road and S.R. 544/C.R. 544
Install rumble strips along the center and edge lines on the north end of the project