Carl M. Hill Student Center
| NAME | JOB TITLE |
| Boggs, Harold A | 100565-Electrician II Electrical Services |
| Davis, Ellsworth E | 110341-Electrician |
| Anderson, Gregory Thomas | 100808-Locksmith I |
| Daniels, John | 100742-Carpenter |
| Manley, Robert | 100750-Locksmith II O&M Residence Life |
| West, Dakota | 100742-Carpenter |
| Woolums, Eric B | 100748-Painter Facilities Service |
| Brown, Stephen M | 100819-HVAC Mechanic II Mechanical Services |
| Renfroe, Brigitte J | 100604-Sr Plumber |
| Blackburn, Billy Joe | 100818-Trades Manager Facilities Service |
| Yett, Issac R | 100585-Grounds/Housekeeping Manager |
| Washington, John A | 100602-Boiler Plant Supervisor Boiler Plant |
| Fallis, Paul | 100699-Mechanical Services Manager |
| Pulliam, Darrell W | 100598-Stationary Fireman II Boiler Plant |
| Stallard, Clarence Edward | 100599-Stationary Fireman II Boiler Plant |
| Sharp, Billy W | 100563-Stock Clerk Warehouse |
| Washington, Lowell Whitney | 100583-Stock Clerk Warehouse |
| Blankenship, Dana | 100571-Custodian Housekeeping |
| Jones, Ramonia A | 100804-Custodian-Team Lead |
| Moore, Monikha M | 100812-Custodian |
| Nicholson, Melvin D | 100580-Custodian I |
| Williams, Lee F | 100586-Team Leader Housekeeping |
| Robertson, Robert Earl | 100590-Groundskeeper I |
| Moore, Jordan | 100802-Custodian Housekeeping |
| Grimes, Greg | 100590-Groundskeeper I |
| Cockrell, George | 100578-Driver/Facilities Specialist |
| Davis III, James | 100578-Driver/Facilities Specialist |
| Hall, Jennifer L | 100810-Driver/Facilities Specialist |
| Porter, Cheryl | 100809-Bus Driver |
| Segar, Philip | 100816-Driver/Facilities Specialist Facilities Ser |
| Washington, Dion | 100578-Driver/Facilities Specialist |
===== PAGE 51 =====
| Cleaning Services |
| Service Days: 5x/week |
| All items below will be completed once every service day, unless otherwise noted |
| Building Areas | | |
| | Entrances, Lobbies, Corridors, Stairwells, Elevators | |
| | | Empty trash daily; clean, damp-wipe waste receptacles 1x/week |
| | | Remove waste, paper, and trash to dumpsters/compactors |
| | | Full vacuum of all carpeted floors 1x/week; spot vacuum 4x/week |
| | | Full sweep and mop of all hard-surface flooring 1x/week; spot sweep/mop 4x/week |
| | | Misc. duties, incl. but not limited to: |
| | | |
| | | Dust furniture and fixtures 1x/week |
| | | Spot-clean walls, carpet, rugs, doors, entrance glass and partitions |
| | Restrooms | |
| | | Mop floors with disinfectant cleaner |
| | | Disinfect mirrors, fixtures & enameled surfaces |
| | | Disinfect basins, urinals, and bowls |
| | | Empty & sanitize waste receptacles |
| | | Remove waste, paper, and trash to dumpsters/compactors |
| | | Misc. duties, incl. but not limited to: |
| | | Disinfect partitions, tile walls and outside surfaces of dispensers |
| | | Restock tissue, soap, and towel dispensers |
| | Academic Areas | Classrooms, Labs, Libraries, Theaters, Auditoriums, Gathering Areas |
| | | Empty trash daily; clean, damp-wipe waste receptacles 1x/week |
| | | Remove waste, paper, and trash to dumpsters/compactors |
| | | Clean whiteboards/blackboards |
| | | Full vacuum of all carpeted floors 1x/week; spot vacuum 4x/week |
| | | Full sweep and mop of all hard-surface flooring 1x/week; spot sweep/mop 4x/week |
| | | Misc. duties, incl. but not limited to: |
| | | Dust furniture and fixtures, windowsills, and HVAC vents 1x/week |
| | | Spot-clean walls, rugs, doors, entrance glass and partitions |
| | Administrative Areas | Offices, Conference Rooms, Workrooms, Kitchenettes |
| | | Empty trash daily; clean, damp-wipe waste receptacles 1x/week |
| | | Remove waste, paper, and trash to dumpsters/compactors |
| | | Full vacuum of all carpeted floors 1x/week; spot vacuum 4x/week |
| | | Full sweep and mop of all hard-surface flooring 1x/week; spot sweep/mop 4x/week |
| | | Misc. duties, incl. but not limited to: |
| | | Dust furniture and fixtures, windowsills 1x/week |
| | | Spot-clean walls, rugs, doors, entrance glass and partitions |
===== PAGE 53 =====
| | Support Areas | Storage Closets, Loading Docks, |
| | | Empty trash daily; clean, damp-wipe waste receptacles 1x/week |
| | | Remove waste, paper, and trash to dumpsters/compactors |
| | | Full vacuum of all carpeted floors 1x/week; spot vacuum 4x/week |
| | | Full sweep and mop of all hard-surface flooring 1x/week; spot sweep/mop 4x/week |
| | Project Work | As needed to maintain APPA 3 appearance |
| | | Clean carpets, strip, scrub and refinish hard-surface floors |
| | | Polish hard-surface floors |
| | | Misc. duties, incl. but not limited to: |
| | | Washing interior windows within reach without a ladder 1x annually |
| | Trash Removal | |
| | | Remove trash from building, place into dumpsters |
| | Weekend Service | |
| | | Additional service, upon request |
| Grounds Services |
| Service Days: Weekly service provided by subcontractor initially, managed by Sodexo |
| Inspect and maintain all lawns, plantings and paved areas/related features at APPA 3 appearance and care levels. Police for debris, trash |
| Sub-contracted work will be managed within the scope of the contractual budgets provided. |
| Mowing | |
| Manage third-party provider to maintain turf at appropriate heights for season, type of grass, level of irrigation. Service provided approximately every 5-7 days in growing season. |
| Prevent rutting of turf/avoid turf scalping |
| Avoid tree and shrub damage |
| Blown down paved areas after mowing |
| Trimming | Where mowing not possible, manage third-party provider, to the same frequency as mowing |
| Edging | Manage third-party provider. Service provided monthly during growing season. |
| Weed Control | Manage third-party provider, 1 pre-emergent application annually in Spring, weeds less than 30% of turf. |
| Fertilization | Manage third-party provider, to apply appropriate fertilizers 2x annually. |
| Mulch | |
| Manage third-party provider, to apply mulch to tree rings and plantings 1x annually |
| Annuals/Perennials | Manage plantings to provide appropriate seasonal color, 2 changes annually |
| Insecticide | Manage third-party provider, to apply appropriate insecticide 1x annually |
| Tree, Shrub & Ground Cover Maintenance |
| See “Mulch” above |
| Manage third-party provider, to prune trees and shrubs per species demand |
| Irrigation | Manage third-party provider, to maintain all irrigation systems weekly |
| Pressure Washing | Manage third-party provider, to pressure wash hardscapes 1x annually |
| Roads and Lots |
| Manage third-party provider, to maintain parking area with sweeping/blowing to remove leaves, gravel, and debris. Service frequency determined by rate of soil/debris collection. |
===== PAGE 55 =====
| Maintenance Services1 |
| Service Days: 5x/week |
| - | Sub-contracted work will be managed within the scope of the contractual budgets provided. |
| Work Requests |
| Emergency Work – started within 1 hour of notification during normal Maintenance working hours, and within 4 hours at all other days/times [on-call] |
| Urgent Work - started within 4 hours of notification during normal Maintenance working hours, and within 48 hours at all other days/times [on-call] |
| Routine Work - started within 4 days of notification, completed within 25 days |
| Project Work - scheduled time permitting, around routine and preventive work, no greater than 3% of technician’s weekly schedule [in aggregate, with setups and moves allocation] |
| Preventive Work - scheduled periodically as per manufacturer’s specifications and industry/ standards |
| Exterior Building – Maintenance |
| Conduct visual inspections; document and correct deficiencies through work orders and preventive maintenance |
| Major projects2 will be contracted to third-party subcontractors. Sodexo will act as Owner’s Representative on all major projects. |
| Interior Building – Maintenance |
| Conduct visual inspections; document and correct deficiencies through work orders and preventive maintenance |
| Equipment and Systems Operations |
| Sodexo will operate and maintain systems, and correct problems in a timely manner |
| Monitor systems with alarms, indicators, and gauges |
| Maintenance on fire protection systems is limited to quarterly visual inspections for corrosion and rust ONLY. Systems inspections provided by certified fire protection Vendors. |
| Heating and Air Conditioning |
| Sodexo to provide services within the skill level of their on-site team, including filter changes and PM. Work beyond this scope will be sub-contracted. |
| Plumbing |
| Sodexo to provide services within the skill level of their on-site team, including unclogging drains/toilets and repairing/replacing certain fixtures and valves. Work beyond this scope will be sub-contracted. |
| Electrical Systems |
| Sodexo to provide services within the skill level of their on-site team, including checking panels, breakers, and other minor electrical tasks. Work beyond this scope will be sub-contracted. |
| Preventive Maintenance |
| Prepare and execute PM schedules, per manufacturer’s guidelines, utilizing Maximo CMMS |
1 As generally applied to all subheadings related to “Maintenance Services,” including, but not limited to, “Exterior Building – Maintenance” and “Internal Building – Maintenance,” prior assessment by the Division of Engineering and Contract Administration will be initiated before the commencement of any work, as applicable under the laws of the Commonwealth of Kentucky.2 Any projects with the projected amount of greater than 10,000.
===== PAGE 56 =====
| Miscellaneous Services |
| Event setups, holiday display setups, not to exceed 3% of weekly hours [in aggregate, with projects and moves allocation] |
| Minor moving services, not to exceed 3% of weekly hours [in aggregate, with setups and projects allocation] |
| Systems |
| Monitor all building systems as necessary. Services for alarms/systems will be sub-contracted, scheduled/managed by Sodexo |
| Communication Systems |
| Sodexo will provide and maintain all necessary communications devices for use in the services |
| Environmental Health and Safety |
| Follow Sodexo's safety requirements as well as regulatory agencies OSHA, NFPA |
| Definitions |
| “Routine Maintenance Work” – Work within the skills of the on-site team |
| “Special Projects” – Work outside of scope of “Routine Maintenance Work” |
| CPE's Concern | KSU's Response | |
| HB 250 mandates CPE to approve all KSU expenditures over $5,000 and create a management improvement plan to assist with the institution's financial and organizational stability. Given this substantial responsibility, it goes without saying that any expenditure of the magnitude of the proposed Sodexo agreement ($3.3 million, or roughly 10% of the KSU operating budget) should garner great attention from CPE... | Kentucky State University understands the provisions set forth in HB 250 (2022) and the protocols and norms established because of the legislation.\nThe first-year costs incurred by the University will depend on the actual services performed by Sodexo (professional leadership, work order tracking system response/maintenance, labor, technology services, and in-house staff training); however, per the Management Agreement and PSC, the total first-year cost shall not exceed 3,200,000.nSodexo projects that the total first-year cost (including the management fee) will not exceed3,068,784.46. The cost can be broken down as follows:\nFY 2023 H2 projected impact: 1,573,097.49nFY 2024 H1 projected impact:1,495,686.97 | |
| First, according to the meeting materials, $3,305,964 is allocated for the new Sodexo services, $996,632 is allocated for the cost of 18 employees (note, the contract identifies 31 Supervised KSU employees), and $1,439,172 for “operating expenses” (i.e., electric, gas, water, contract services, etc.), which total the $5.7 million projected FY 23 operating expenditures for KSU Facilities and Infrastructure. This is approximately the same amount currently budgeted for said expenditures, 5.5 million.nI am concerned this does not comprise the entirety of the budgeted Facilities and Infrastructure expenditures. For example, Frankfort Plant Board (FPB) monthly invoices approved by CPE, which cover water and electric, usually total around142,000 to $145,000 per month, which alone total roughly $1.7 million annually. A recent standing purchase order for annual campus natural gas payments totaled $150,000. In addition, all supplies and equipment for the services provided by Sodexo and existing KSU employees must still be purchased by KSU. These costs will inevitably go up as more services are provided. There may be other costs budgeted for Facilities and Infrastructure as well that we have not been made aware of. | The total one-year costs for KSU's current staff and operation services (i.e., utilities, contracts, etc.) are detailed below and, based on current year-to-date expenditures, are projected to cause an overrun of the annual budget in the amount of $3.5 million.\nTotal\nThe current year-to-date Facilities Budget (110001) includes expenditures for utilities, which is budgeted as E&G (85%) and Land Grant (15%) and paid monthly. | |
| 5 Months | 7 Months | Annual |
| Labor | $870,301.22 | $1,218,421.71 | $2,088,722.93 |
| Services | $2,861,122.06 | $4,005,570.88 | $6,866,692.94 |
| Total | $3,731,423.28 | $5,223,992.59 | $8,955,415.87 |
===== PAGE 69 =====
| ...[T]he annual budget, actual expenditures for Facilities and Infrastructure totaled $5,237,225.00 as of April 30, 2022. The $3.3 million for Sodexo is by and large for new services, and it is unclear where the savings have been gained from last fiscal year. We are not aware of any significant changes in expenses for Facilities and Infrastructure. There will be some savings from contracts canceled for services currently provided in these areas, but certainly not to this magnitude. | The Sodexo contract is necessary to address the Declaration of Emergency recognized by the KSU Board of Regents and the deplorable conditions that our students and staff continue to work and study through. This contract allows us to gain the institutional controls necessary to manage costs and leverage resources caused by a deferred maintenance plan. |
| Leaving this issue aside, there is a fair amount of budget uncertainty in general to give pause on such a large expenditure. On June 3, 2022, the Board approved a $36,821,600 annual budget for FY 22/23, including $5,500,000 projected Facilities and Infrastructure expenditures, as noted above. The agenda items stated that the unit alignment is only a recommendation based on current year operations. The budget includes a $7 million reduction. Final alignment will be based off the President's final review and decision for each department. To date, we have not seen this reconciliation, nor have we seen a revised budget based on actual student and mandatory fee collections, which make up 40.74% of the approved budget. | To our knowledge, the 2023 budget is $41 million. This is what Dr. Shields shared with the Board and legislative committees on numerous occasions. |
| We are extremely pleased that the Board approved the contract for outside accounting assistance. As you know, CPE is providing incentive funding in the amount of $500,000 for this purpose. As part of the justification for the services, KSU staff states that the University “lacks the competencies to prepare monthly bank reconciliations and forecasts on cash flows, budget executions, and key performance indices.” While we fully expect the contractor to quickly provide Dr. Burnette with the assistance he so desperately needs, with the current deficit in capacity, ANY new significant expenditure is questionable. | The poor conditions of KSU's custodial, grounds, and maintenance operations reflect the need for an overhaul of the management processes, procedures, and practices so that they can align with the purposes and objectives of the management improvement plan. Moreover, they reflect the need for financing support to normalize expenses to the budget over the current and following fiscal years. |
| As for the negotiated agreement, Sodexo is proposing to bring in a significant number of staff, with 11 leadership positions that include a full-time HR manager for their 42 employees and a “Unit Controller,” who will ensure compliance with financial policies and procedures. More justification should be provided for this need. In addition, the presentation materials and agenda items state that the costs will be based on actual services provided that are preapproved by KSU and that the exact first-year cost will depend on the services actually rendered by Sodexo. However, | This issue has been addressed in the Sodexo PSC and Management Agreement. |
===== PAGE 70 =====
| the actual contract appears to be based on a fixed price billed at a daily rate (total contract price divided by 365) that cannot be adjusted until January 1, 2024. Assuming that the contract is correct, this would cause KSU to forgo any opportunity of receiving savings if projected services needed are less than projected. | |
| And finally, please be advised that this contract will go before the Government Contracts Review Committee of the General Assembly for approval. Recently, the Committee has given significant scrutiny to any no-bid contracts, regardless of the nature of the circumstances that required for going the standard bid process. That, coupled with the significant amount of this agreement, will undoubtedly catch the members' attention, and inevitably require public testimony from the institution concerning the arrangement. | It is essential that any case made in support of this endeavor includes a discussion of the conditions that led to the Board's Declaration of Emergency. |
| I would have much preferred to continue these conversations with President Johnson and Dr. Burnette and allow them to correct any incorrect assumptions made here and provide the additional rationale requested, but with the item being placed for Board action tomorrow (December 9, 2022), there was simply no time. With CPE policy requiring KSU Board approval for any contracts resulting in expenditures over $5,000, CPE's overall responsibility for fiscal oversight of the institution, and my personal commitment to the success of the institution, I felt it was imperative that I bring these issues to your attention before a decision is made. Please understand that CPE is not opposed to an outsourced facilities management approach if we can be assured that KSU has sufficient resources to support it and that the institution receives the best deal possible. | This matter has been clarified. |