Approval of Phase II Purchase and Installation of Keyless Door Locks in Residence Halls.
This request is for equipment and services to replace access controls on approximately 38 new exterior and corridor doors, repair 30 exterior and corridor doors, install talk-a-phone systems on 10 door entrances, install control boards/panels in 7 closet locations and install 1 fire glass door in the Residence Halls.
Transact Campus, Inc.
Hardware and Installation - $177,331.66 (Federal Funds)
Acting President Stamps recommends that the Board of Regents approve the Phase II Purchase and Installation of Keyless Door Locks in Residence Halls.
Approve the Phase II Purchase and Installation of Keyless Door Locks in Residence Halls.