5.7. With regard to the third bullet point identified above, it should be noted that a series of recommendations have been identified, to support the acceleration of PBSA development and the defensibility of the supply pipeline. These are identified in bold within Table 4.1's recommendations and are not repeated here.
Table 5.1: PBSA Supply Deliverability and Defend-ability
Deliverability & Defend-ability RatingTotal No. Bedspaces (based on indicative capacity)
Amber11,42712,876 bedspaces2
Green1,449
Table 5.2: PBSA Supply
Expected Delivery Timescales0-3 Years (2023 - 2025)c.3-4 Years (2026)5+ Years (2027-2030)TOTAL PERIOD (2023 - 2030)
PBSA Bedspaces Deliverable1,9434,4316,50212,8763
PBSA Bedspaces Demand / Required43,040 (4,528)760 (1,132)3,040 (4,528)6,840 (10,188)
Shortall1,097 (2,585)-3,671 (3,299)-3462 (1,974)-6,036 (2,688)
22 Total figure excludes the 350 bedspaces referenced in paragraph 4.2 relating to Owen’s Park.
3 Ibid.
4 Based on identified need for c. 760 PBSA bedspaces required per annum for period up to and including 2030 (figure in brackets represents the higher 2% growth scenario).