Addenda
to
Grant Agreement
[P#]
1. Addendum to Approved Budget
The approved budget to complete the work under this grant is further defined as follows:
| Budget Item | Federal Admin | Federal Program | Recipient Share Admin | Recipient Share Program | Total |
|---|
| Personnel | | | | | $- |
|---|
| Fringe Benefits | | | | | $- |
|---|
| Travel | | | | | $- |
|---|
| Supplies | | | | | $- |
|---|
| Equipment | | | | | $- |
|---|
| Contractual | | $42,500.00 | | | $42,500.00 |
|---|
| Construction | | $444,350.00 | | | $444,350.00 |
|---|
| Other | $3,500.00 | $4,500.00 | | | $8,000.00 |
|---|
| Indirect Costs | | | | | $- |
|---|
| Total | $3,500.00 | $491,350.00 | $- | $- | $494,850.00 |
|---|
2. Addendum to Article VI - Statement of Work
The Statement of Work is further defined to include:
- Preservation and repair of the Jackson Hall at 108 Jackson Drive, Frankfort, KY, per the Secretary of the Interior's Standards and Guidelines for Archeology and Historic Preservation, to include:
- i.Stabilize and reconstruct the brick crenellations at top of the exterior parapet walls.
- ii.Tuckpoint turret crenellations and replace existing weather caps
- iii.Repair tower roof leak(s) and replace dam
- iv.Repair/replace concrete steps leading into primary entrance.
- v.Repair & repaint primary entrance doors, windows, and frames
- vi.Install exterior perimeter security system and electronic access system as all exterior doors.
- vii.Install new ADA accessible elevator
- viii.Reconstruct restrooms to provide ADA compliance/accessibility
- ix.Architectural/Consultant service*
*Requires approval by NPS ATR prior to hire
3. Addendum to Article XV – Reports, Outcomes, & Deliverables
The Reports, Outcomes, and Deliverables are further defined to include:
1. Draft documents to be submitted digitally and reviewed as related to the Statement of Work: