The approved budget to complete the work under this grant is further defined as follows:
| Budget Item | Federal Admin | Federal Program | Recipient Share Admin | Recipient Share Program | Total |
|---|
| Personnel | | | | | $- |
|---|
| Fringe Benefits | | | | | $- |
|---|
| Travel | | | | | $- |
|---|
| Supplies | | | | | $- |
|---|
| Equipment | | | | | $- |
|---|
| Contractual | | $42,500.00 | | | $42,500.00 |
|---|
| Construction | | $444,350.00 | | | $444,350.00 |
|---|
| Other | $3,500.00 | $4,500.00 | | | $8,000.00 |
|---|
| Indirect Costs | | | | | $- |
|---|
| Total | $3,500.00 | $491,350.00 | $- | $- | $494,850.00 |
|---|
The Statement of Work is further defined to include:
Preservation and repair of the Jackson Hall at 108 Jackson Drive, Frankfort, KY, per the Secretary of the Interior's Standards and Guidelines for Archeology and Historic Preservation, to include:
Stabilize and reconstruct the brick crenellations at top of the exterior parapet walls.
Tuckpoint turret crenellations and replace existing weather caps
Repair tower roof leak(s) and replace dam
Repair/replace concrete steps leading into primary entrance.
Repair & repaint primary entrance doors, windows, and frames
Install exterior perimeter security system and electronic access system as all exterior doors.
Install new ADA accessible elevator
Reconstruct restrooms to provide ADA compliance/accessibility
Architectural/Consultant service*
*Requires approval by NPS ATR prior to hire
The Reports, Outcomes, and Deliverables are further defined to include:
1. Draft documents to be submitted digitally and reviewed as related to the Statement of Work: