124 Frazier Ct Georgetown, KY 40324 Tax ID 61-1384429 502.570.8444 servpro10163@gmail.com

CONTINUED - 212

DESCRIPTIONQTYREMOVEREPLACETAXO&PTOTAL
49. Tape joint for new to existing drywall - per LF26.00 LF0.007.130.5137.18223.07
50. Fill holes created by wall cavity drying29.00 EA0.001.750.0510.1860.98
51. Cove base molding - rubber or vinyl, 4" high42.02 LF0.002.853.0524.58147.39
52. Mask the floor per square foot - plastic and tape - 4 mil114.94 SF0.000.210.414.9029.45
53. Content Manipulation charge - per hour4.00 HR0.0041.0611.8232.84208.90
54. Protect contents - Cover with plastic100.00 SF0.000.211.514.2026.71
55. Clean and deodorize carpet - heavy staining114.94 SF0.000.746.1217.02108.20
57. Final cleaning - construction - Commercial114.94 SF0.000.231.915.2833.63
Totals: 21240.55285.302322.08

Totals: 212

DESCRIPTIONQTYREMOVEREPLACETAXO&PTOTAL
11. Suspended ceiling tile - 2' x 2'12.00 SF0.008.751.0521.22127.27
1. Batt insulation - 4" - R13 - paper / foil faced125.00 SF0.000.935.0324.26145.54
3. 5/8" drywall - hung, taped, floated, ready for paint130.00 SF0.002.245.3059.30355.80
5. Tape joint for new to existing drywall - per LF250.00 LF0.007.134.95357.502,144.95
6. Seal/prime then paint more than the walls twice (3 coats)2,429.38 SF0.001.1243.73552.923,317.56
8. Mask the floor per square foot - plastic and tape - 4 mil1,187.84 SF0.000.214.2850.76304.49
9. Clean floor, strip & wax1,187.84 SF0.000.9782.96230.441,465.60

Hallway

Height: 8'

2,273.38 SF Walls1,187.84 SF Ceiling
3,461.22 SF Walls & Ceiling1,187.84 SF Floor
131.98 SY Flooring284.17 LF Floor Perimeter
284.17 LF Ceil. Perimeter

Totals: Hallway

8/31/2022