124 Frazier Ct

Georgetown, KY 40324

Tax ID 61-1384429

502.570.8444

servpro10163@gmail.com

CONTINUED - 407F

DESCRIPTIONQTYREMOVEREPLACETAXO&PTOTAL
104. Clean and deodorize carpet - heavy staining91.04 SF0.000.744.8513.4885.70
105. Final cleaning - construction - Commercial91.04 SF0.000.231.514.1826.63
Totals: 407F17.18125.98765.96

Back Hall

Height: 8'

878.67 SF Walls 234.50 SF Ceiling

DESCRIPTIONQTYREMOVEREPLACETAXO&PTOTAL
138. Batt insulation - 6" - R19 - paper / foil faced59.00 SF0.001.132.8713.9283.46
137. 5/8" - drywall per LF - up to 2' tall42.50 LF0.008.683.9074.56447.36
139. Tape joint for new to existing drywall - per LF58.00 LF0.007.131.1582.94497.63
141. Fill holes created by wall cavity drying67.00 EA0.001.750.1223.48140.85
140. Seal/prime then paint the walls (2 coats)878.67 SF0.000.8110.02144.34866.08
142. Cove base molding - rubber or vinyl, 4" high109.83 LF0.002.857.9764.20385.19
143. Mask the floor per square foot - plastic and tape - 4 mil234.50 SF0.000.210.8410.0260.11
144. Final cleaning - construction - Commercial234.50 SF0.000.233.8910.7868.61
145. Clean and deodorize carpet - heavy staining234.50 SF0.000.7412.4934.70220.72
Totals: Back Hall43.25458.942,770.01

1,113.17 SF Walls & Ceiling 234.50 SF Floor

26.06 SY Flooring 109.83 LF Floor Perimeter

109.83 LF Ceil. Perimeter