124 Frazier Ct Georgetown, KY 40324 Tax ID 61-1384429 502.570.8444 servpro10163@gmail.com

CONTINUED - 407G

DESCRIPTIONQTYREMOVEREPLACETAXO&PTOTAL
107. Seal/prime then paint the walls (2 coats)366.67 SF0.000.814.1860.24361.42
111. Fill holes created by wall cavity drying45.00 EA0.001.750.0815.7894.61
112. Cove base molding - rubber or vinyl, 4" high45.83 LF0.002.853.3326.78160.73
113. Mask the floor per square foot - plastic and tape - 4 mil131.29 SF0.000.210.475.6233.66
114. Content Manipulation charge - per hour2.00 HR0.0041.065.9216.42104.46
115. Protect contents - Cover with plastic100.00 SF0.000.211.514.2026.71
116. Clean and deodorize carpet - heavy staining131.29 SF0.000.747.0019.44123.59
117. Final cleaning - construction - Commercial131.29 SF0.000.232.176.0438.41

Totals: 407G

24.66

407F

Height: 8'

Hei
310.67 SF Walls91.04 SF Ceiling
401.71 SF Walls & Ceiling91.04 SF Floor
10.12 SY Flooring38.83 LF Floor Perimeter
38.83 LF Ceil. Perimeter
DESCRIPTIONQTYREMOVEREPLACETAXO&PTOTAL
94. Suspended ceiling tile - 2' x 2'4.00 SF0.008.750.357.0842.43
95. Seal/prime then paint the walls (2 coats)310.67 SF0.000.813.5451.02306.20
99. Fill holes created by wall cavity drying38.00 EA0.001.750.0713.3279.89
100. Cove base molding - rubber or vinyl, 4" high38.83 LF0.002.852.8222.70136.19
101. Mask the floor per square foot - plastic and tape - 4 mil91.04 SF0.000.210.333.8823.33
102. Content Manipulation charge - per hour1.00 HR0.0041.062.958.2252.23
103. Protect contents - Cover with plastic50.00 SF0.000.210.762.1013.36