124 Frazier Ct
Georgetown, KY 40324
Tax ID 61-1384429
502.570.8444
servpro10163@gmail.com
| DESCRIPTION | QTY | REMOVE | REPLACE | TAX | O&P | TOTAL |
|---|
| 126. Batt insulation - 4" - R13 - paper / foil faced | 24.00 SF | 0.00 | 0.93 | 0.96 | 4.66 | 27.94 |
|---|
| 127. 5/8" drywall - hung, taped, floated, ready for paint | 24.00 SF | 0.00 | 2.24 | 0.98 | 10.96 | 65.70 |
|---|
| 128. 5/8" - drywall per LF - up to 2' tall | 32.00 LF | 0.00 | 8.68 | 2.94 | 56.14 | 336.84 |
|---|
| 129. Tape joint for new to existing drywall - per LF | 32.00 LF | 0.00 | 7.13 | 0.63 | 45.76 | 274.55 |
|---|
| 130. Fill holes created by wall cavity drying | 30.00 EA | 0.00 | 1.75 | 0.05 | 10.52 | 63.07 |
|---|
| 131. Seal/prime then paint the walls twice (3 coats) | 366.67 SF | 0.00 | 1.12 | 6.60 | 83.46 | 500.73 |
|---|
| 132. Cove base molding - rubber or vinyl, 4" high | 45.83 LF | 0.00 | 2.85 | 3.33 | 26.78 | 160.73 |
|---|
| 133. Clean and deodorize carpet - heavy staining | 131.29 SF | 0.00 | 0.74 | 7.00 | 19.44 | 123.59 |
|---|
| 134. Mask the floor per square foot - plastic and tape - 4 mil | 131.29 SF | 0.00 | 0.21 | 0.47 | 5.62 | 33.66 |
|---|
| 135. Content Manipulation charge - per hour | 6.00 HR | 0.00 | 41.06 | 17.74 | 49.28 | 313.38 |
|---|
| 136. Protect contents - Cover with plastic | 150.00 SF | 0.00 | 0.21 | 2.27 | 6.30 | 40.07 |
|---|
| Totals: 407H | 42.97 | 318.92 | 1,940.26 |
407G Height: 8'
366.67 SF Walls 497.96 SF Walls & Ceiling 14.59 SY Flooring 45.83 LF Ceil. Perimeter 131.29 SF Ceiling 131.29 SF Floor 45.83 LF Floor Perimeter
DESCRIPTION QTY REMOVE REPLACE TAX O&P TOTAL
SU_HATHAWAY_RE 8/31/2022