124 Frazier Ct Georgetown, KY 40324 Tax ID 61-1384429 502.570.8444 servpro10163@gmail.com
KSU_HATHAWAY_RE Ground Floor
| DESCRIPTION | QTY | REMOVE | REPLACE | TAX | O&P | TOTAL |
|---|---|---|---|---|---|---|
| 286. Tandem axle dump trailer - per load - including dump fees | 1.00 EA | 197.46 | 0.00 | 0.00 | 39.50 | 236.96 |
| 287. Commercial Supervision / Project Management - per hour | 28.00 HR | 0.00 | 71.67 | 0.00 | 401.36 | 2,408.12 |
Total: Ground Floor
| 694.67 SF Walls | 441.46 SF Ceiling |
|---|---|
| 1,136.13 SF Walls & Ceiling | 441.46 SF Floor |
| 49.05 SY Flooring | 86.83 LF Floor Perimeter |
| 86.83 LF Ceil. Perimeter |
Height: 8'
| DESCRIPTION | QTY | REMOVE | REPLACE | TAX | O&P | TOTAL |
|---|---|---|---|---|---|---|
| 277. Suspended ceiling tile - 2' x 2' | 16.00 SF | 0.00 | 8.75 | 1.40 | 28.28 | 169.68 |
| 278. Fill holes created by wall cavity drying | 37.00 EA | 0.00 | 1.75 | 0.07 | 12.98 | 77.80 |
| 279. Seal/prime then paint the walls (2 coats) | 694.67 SF | 0.00 | 0.81 | 7.92 | 114.12 | 684.72 |
| 280. Mask the floor per square foot - plastic and tape - 4 mil | 441.46 SF | 0.00 | 0.21 | 1.59 | 18.86 | 113.16 |
| 281. Cove base molding - rubber or vinyl, 4" high | 43.42 LF | 0.00 | 2.85 | 3.15 | 25.40 | 152.30 |
| 282. Content Manipulation charge - per hour | 4.00 HR | 0.00 | 41.06 | 11.82 | 32.84 | 208.90 |
| 283. Final cleaning - construction - Commercial | 441.46 SF | 0.00 | 0.23 | 7.31 | 20.30 | 129.15 |
| 284. Clean and deodorize carpet - heavy staining | 441.46 SF | 0.00 | 0.74 | 23.52 | 65.34 | 415.54 |
| Totals: OP3 | 56.78 | 318.12 | 1,951.25 |