Transport and AccessProximity to key destinations: ● 9 mins walk to UoM Campus (0.5 miles) ● 19 mins walk to MMU Campus and RNCM (1 mile) ● 32 mins walk to city centre heart / St Peters Square (1.5 miles) ● 28 mins walk to Oxford Road Station (1.4) ● 35 mins walk to Piccadilly Station (1.7 miles) ● 2 mins walk to Oxford Road (150 yards) Accessibility: ● Closest convenience store located 3 minute walk (200m) west along Oxford Road. ● Restaurants, bars and other leisure uses located within a 3-6 mins walk west, predominantly along Oxford Road. ● Frequent buses run along Oxford Road (3 mins walk) as well as access to key cycling routes.
Ground ConditionsModerate to low risks have been identified which are not unusual for this type of development and can be mitigated.
EcologyNo ecological designations on the site. No Tree Preservation Orders. Large quantity of trees currently on site - note the 3:1 typical MCC tree replacement ratio.
Air QualityThis site is close but not located within the Manchester Air Quality Management Area
Noisen/a
Green and Blue InfrastructureThe MCC Green and Blue Infrastructure Strategy emphasis the need to retain and enhance green infrastructure. Noting the large number of existing trees on the site.
Daylight and SunlightAn assessment submitted with the planning application advise that the development demonstrates a high level of compliance with the guidance set-out in the BRE Report and endorses the development in terms of daylight and sunlight amenity.
Townscape and Visual ImpactThe scheme may impact the townscape however there are existing high rise developments within the vicinity.
Capacity (indicative)319 PBSA bedspaces.
Infrastructure Capacity (limitations)N/A
Buildability / Constriction LogisticsN/A
Viability IssuesThe applicants's submitted viability appraisal states: "The Applicants are committed to delivering the scheme and have carefully designed the scheme to ensure that it is deliverable. The application is supported by a Viability Statement prepared by AY to demonstrate that the quantum of development proposed is the minimum necessary to bring forward the development, to justify demolition of non-designated heritage assets and the scale of new buildings; and to demonstrate that the scheme is deliverable. The appraisal within the Viability Statement generates a profit to ensure the scheme is deliverable in accordance with Policy H12, however, the Statement also demonstrates in financial terms that the proposed scheme is the minimum necessary to create a viable / deliverable scheme. The alternative scenarios tested unequivocally prove that the two new buildings are fundamental to ensuring a deliverable scheme, without these elements the scheme would be unviable and therefore not deliverable."