Key Findings and Recommendations· Relatively limited proposals for PBSA (maximum of 60 bedspaces). · Given the more limited nature of the proposals, they should be capable of coming forward before a revised Development Framework. · Our initial recommendation is to discuss with IQ and further understand their likely plans and timing for delivery.
PBSA Scheme (& Operator):John Dalton East – MMU
Status:Pre-Planning
Status Rating:Amber
Image
Site Description and Existing Use· Located in the Deansgate Ward adjacent to Oxford Road to the east and just too the north of the Mancunian Way flyover. · Bounded by Chester Street to the north and John Dalton Central to the west. · John Dalton East is currently occupied by MMU's Faculty of Science and Engineering with a replacement Science and Engineering Building currently under construction to the west of the Site. · Existing building is five storeys high and contains two internal courtyards. · Existing building can be accessed from Chester Road and Oxford Road.
Planning History· No relevant planning history.
Land Ownership· Manchester Metropolitan University
Adjacent Land Uses & Impact Considerations· Mixed-use development (The Quadrangle) immediately to the north including student accommodation, commercial units and residential accommodation. Further beyond is the Great Marlborough Street development identified for 853 bedspaces within a 55 storey tower / MSCP. · To the east is Circle Square which includes high density student accommodation, apartments and office development as well as the Manchester Technology Centre and Symphony Park. · Below the Manunian Way to the east is Hatch (F&B). · To the south is the Mancunian Way overpass with the MMU Campus just beyond, including the Law School, Library and All Saints Park. · Immediately to the west is the MMU John Dalton West development, comprising a new building for MMU's Science and Engineering department (due to complete in Q3 2023).