| Ground Conditions | No information currently available |
|---|
| Ecology | No ecological designations on the site.No Tree Preservation Orders. |
|---|
| Air Quality | This site is located within the Manchester Air Quality Management Area which is an area where proactive management measures are encouraged to address national air quality objectives. |
|---|
| Noise | Potential noise impacts from Mancunian Way to the south and east from the road traffic along the Mancunian Way and London Road. |
|---|
| Green and Blue Infrastructure | The North Campus SRF highlights an opportunity to enhance existing public green spaces and create more high quality city centre spaces. It also highlights an opportunity to create more green corridor infrastructure. |
|---|
| Daylight and Sunlight | The scheme may result in the loss of some daylight/sunlight to neighbouring properties, particularly to the north-west in Granby Row residential community, although it is understood some of the properties directly overlooking the site are in a serviced apartment use. |
|---|
| Townscape and Visual Impact | The scheme may impact the townscape; however, there are existing high rise developments within the vicinity. |
|---|
| Capacity (indicative) | No feasibility / capacity work has been undertaken to date. |
|---|
| Infrastructure Capacity (limitations) | TBC – subject to further feasibility / design work. |
|---|
| Buildability / Constriction Logistics | N/A |
|---|
| Viability Issues | North Campus SRF (2017) does not identify PBSA as a use within the site as indicated on the masterplan. Bruntwood Sci tech has also not identified this within ID Manchester.TBC – subject to further feasibility / design work. |
|---|
| Deliverability Timescales | Current Status: Pre-Planning. New / revised SRF for ID Manchester to be produced – work ongoing. |
|---|
| |
| Timescales for delivery subject to Bruntwood Sci-Tech and UoM delivery strategy / programme:
Masterplan approval: c. Q4 2022 (c. 4 months)
SRF endorsed: c. Q3/Q4 2023 (c. 12 months)
Estimated duration (whole SRF area completed): c. 15 years |
|---|
| Key Findings and Recommendations | Heritage - site contains three Grade II Listed assets and is partially located within the Whitworth Street Conservation Area.
Various plots across the masterplan could accommodate a PBSA building. The entire site is within the single ownership of the UoM.
North Campus SRF (2017) does not identify PBSA as a use within the site as indicated on the masterplan.
The UoM and Bruntwood Sci tech are progressing plans for an internationally significant applied innovation district. Vision for ID Manchester is focused on delivery a mixed-use neighbourhood for businesses – to co-locate businesses, access to key talent pools and knowledge ups and access to transport and digital connectivity. This would be delivered over the next 10-15 years.
A revised masterplan is currently being prepared and will anticipate will be subject to a refreshed SRF.
We understand that PBSA is not currently identified by the landowner and JV as a desired component of the innovation district. |
|---|
| PBSA Scheme (& Operator): | IQ Echo Street – IQ Student |
|---|
| Status: | Planning Permission Validated – Under determination |
|---|
| Status Rating: | Amber |
|---|