| Planning Application | Name | Description |
|---|
| 13 | 2008/0912 | Former Walters Yard Pontliw Swansea | Construction of 67 dwellings with associated access, roads, parking, open space and demolition of existing buildings. Approved with S106 in March 2016. |
| Submitted but not determined |
| 14 | 2011/0345 | Land at Llewellyn Road, Penllergaer | Construction of up to 200 residential units with associated access (outline). |
| 15 | 2012/0721 | Royal Fern Golf Resort | Application to vary Condition 8 of Outline Planning Permission 2008/0154 to extend the period for the submission of the reserved matters for a further three years in relation to the proposed development of 18 hole championship and 9 hole par 3 golf courses, golf club house including health facilities, sauna, swimming pool, gymnasium, golf school and academy, 80 golfing lodges, approximately 135 housing plots, green keepers flat, associated infrastructure, car parking and landscaping (outline). |
| 16 | 2014/0977 | Parc Ceirw, Cwmrydydyceirw Quarry, Swansea | Proposed cessation of landfill and other operations enabled by residential development of circa 300 dwellings, public open space and associated highway and ancillary works (outline) |
| 17 | 2017/1822/OUT | Land West Of Llangyfelach Road Tirdeunaw | Outline planning application (with all matters reserved apart from strategic access junctions) for residential led mixed use development, to be developed in phases, including up to 1950 dwellings, link road, local centre provision of a primary school, community facilities, Public Open Space including facilities for children, and areas of landscaping (including sustainable drainage systems), outdoor sports provision including playing pitches, associated services, infrastructure and engineering works including new vehicular access, improvements to the existing highway network, new roads, footpaths / cycleways, and ancillary works. |
| 18 | 2016/1478 | Land North Of Garden Village Swansea | Hybrid planning application (with all matters reserved apart from strategic access) for residential-led mixed use development, to be developed in phases, including approximately 750 residential units; provision of 1 no. Primary school; circa 280m2 - 370m2 flexible A1-A3 / D1 floorspace; open space including |