Abergelli PEIR 2018 – CHAPTER 4: APPROACH TO ENVIRONMENTAL IMPACT ASSESSMENT
Planning ApplicationNameDescription
62007/1250 (varied by 2017/0325/S73)Former J R Steelworks, BryntywodRetention of use of land as timber recycling centre including processing of wood, wooden materials, associated plant and machinery and previously tipped inert material together with on-site storage of wood chip material, construction of building for the dry storage of recycled wood waste and the creation of a 1m high clay bund around southern, western and northern boundaries of the site without complying with conditions 2, 3, 5, 9, 10, 11, 14 and 16 of planning permission 2007/1250 granted 11th December.
72012/1221Mynydd y Gwair Wind FarmInstallation of 16 wind turbines (maximum height to blade tip of 127 m with a hub height of 80 metres), with a maximum generating capacity of 48MWe, associated tracks and ancillary infrastructure.
Permitted but not implemented
82013/0795Tyle Coach Mawr Wind FarmInstallation of four 5 kW wind turbines 20.7 m to tip and associated infrastructure.
92013/1835Felindre Business ParkConstruction of park and ride/share car park (approximately 480 spaces) with new vehicular access, security office, toilet, engineering and associated works, including lighting, fencing, drainage attenuation and landscaping.
102015/1529 (appeal ref 4369653)Llettyr Morfil FarmConstruction of a 4.9 MW solar park (approx. 8.8 ha) including photovoltaic panels, four inverter stations, centre station, new access tracks, security fencing, security cameras and associated equipment and infrastructure works. Allowed on appeal in June 2016
112015/0308Plot 8 Felindre Strategic Business ParkTwo/three storey private hospital development with associated landscaping, site roads and car parking
122016/1522Griffiths Waste Management Site, Bryntywod Llangyfelach Swansea SA5 7LPDemolition of existing waste management facility buildings and construction of replacement buildings and associated infrastructure