Table 4-6: Projects considered with the cumulative assessment
| Planning Application | Name | Description | |
|---|---|---|---|
| Under Construction | |||
| 1 | 2006/0773 (varied by 2009/1520 and 2011/1143 ) and consecutive temporary planning permissions 2007/2513, 2009/0062, 2009/1585, 2011/1311 and 2014/0913 (varied by 2016/1270 ) | Felindre Business Park | Strategic business park for B1 and B2 uses to accommodate emerging industries, high tech manufacturing, high level services, ancillary uses, associated car parking, landscaping and access roads (outline). The site has been laid out and is effectively a serviced site, however no buildings have been constructed. Park and ride schemes also operate on match days to the Liberty football stadium; and for car parking for the Driver and Vehicle Licensing Agency (DVLA) site in Longview Road, Morriston. |
| 2 | 2013/0135 | Abergelli Solar Farm | Installation of ground mounted array of solar panels, inverter substations and 2.4 m high fencing on land at Abergelli Farm. This development will be located adjacent to the Gas Connection. |
| 3 | 2013/0865 | Cefn Betingau Phase 1, Morriston | Construction of 9MW solar park consisting of installation of up to 135,000 photovoltaic panels and 9 inverter/transformer cabins and a single control building |
| 4 | 2014/0739 | Gelliwern Isaf solar park | 6MWe solar park at Gelliwern Isaf Farm -installation of a solar PV array, construction of a storage room, inverter cabin, a substation, switchgear building and fencing |
| 5 | 2014/1022 | Brynwhilach Solar Park | Construction of 12.69MWe solar park consisting of installation of up to 47,000 photovoltaic panels and 8 inverter/transformer stations, 2 substations, storage container, new access tracks, security fencing/cctv and associated equipment and infrastructure work. |