===== PAGE 1 =====
## NCTCOG PRESENTATION HICKORY TREE ROAD PLANNING STUDY
SHAWN CONRAD – PRINCIPAL TRANSPORTATION PLANNER 10.12.22
## About NCTCOG
• North Central Texas Council of Governments (NCTCOG)
Metropolitan Planning Organization (MPO) for the Dallas-Fort Worth region
• Regional Transportation Council (RTC)
• Transportation Actions
• Funding of “Projects and Programs”
• Effectiveness and Equity
www.nctcog.or
g
===== PAGE 2 =====
staff to develop context-sensitive corridor plan facilitating economic growth
Elam Road to Bruton Road
April 2021: RTC approved COVID Round 4 funding award for Phase 1 Hickory Tree Road construction: Elam Road to Lake June Road
$13.5M Total: $8.2M Federal / $5.3M Local (County) / 260K Regional Transportation Development Credits
• Anticipated FY 22-25: Engineering, Right of Way, Utilities, & Construction
Funding partners include NCTCOG, County, TxDOT, and City of Balch Springs
Hickory Tree Road Planning Study
/CULT.
### Project Background (cont.)
Improvements to Hickory Tree Road were recommended in the 2019 Balch Springs Mobility Plan and 2036 Comprehensive Plan.
## BALCH SPRINGS
LOCATION MAP
#### #5 – HICKORY TREE ROAD. PHASE 1 (LAKE JUNE ROAD TO ELM ROAD). PHASE 2 (BRUTON ROAD TO LAKE JUNE ROAD)
| Existing | Planned |
| Lanes | 3 lane undivided(two-way left turn lane) |
| Sidewalks | ✓ |
| Bicycle/Trol | ✓ |
| Transit Route | ✓ |
| Freight Route | - |
| Institute & Congestion | Pedestrian/ Multimodal | Safety | Economic Development | Freight | [F4] |
| ✓ | ✓ | ✓ | ✓ | |
##
Batch Springs Mobility Plan Project Candidates
| Project Type | Roadway Widening |
| Thoroughness Classification | Collector |
| Length | 2.03 mi |
| From | Brion Road |
| To | Elon Road |
##
Current traffic volumes are at or near capacity for segments of Hickory Tree Rd between Bruton Rd and Elam Rd; the Phase 1 segment (Ioke June Road to Elam Road) is the highest priority for improvements
Current roadway does not have continuous sidewalks
##
The lack of separation to ten-turning vehicles can increase overall roadway delay
Moderate crash rate between Lake June Rd and Bam Rd
| 2018 Traffic Count | 9,200 |
| 2018 V/C | 1.05 |
| 2018 LOS | F |
| 2045 V/C | 1.41 |
| 2045 LOS | F |
##
- Comprehensive Plan recommendations
- Improve Hickory free Road in coordination with planned development
- Widend roadway to 3 lanes to improve traffic flow and support access to development
- Add sidewalk and a shared-use path to accommodate pedestrian and bicycle travel
- Additional right-of-way may be necessary at major intersections for turn-lane storage
- Implementation could occur in phases, with the segment from Lake June 2020 to Blam Road recommended for improvement in Phase 1
##
Parkway Travel Lane Two-Way Travel Lane Parkway
Left Turn Lane
===== PAGE 3 =====
it and meet the needs of the community
• Enhance bicycle/pedestrian experience along the study corridor
• Increase safety for bicyclists and pedestrians
• Increase comfort
• Connect key amenities and services along the study corridor
• Schools, Parks, Municipal Buildings, Commercial Areas
• Facilitate economic opportunity along the study corridor
## Planning Project Limits
Project Limits: Hickory Tree Road, from Bruton Rd to Elam Road
Corridor length: 2.03 miles
===== PAGE 4 =====
• Travel modes, safety concerns, future visions for corridor
• Respondents reported low rates of walking or biking, but high desire with safer conditions. Congestion, driveway exits were points of concern.
Virtual Stakeholder Meetings: June 2021
• Residents, Business Owners, Technical Stakeholders
Virtual Open House: September 2021-November 2021
Pre-recorded presentation, questionnaire about preliminary recommendations and planning project work to date
Hickory Tree Road Planning Study
## Site Visits
Walk Audit: 12/3/2020
• NCTCOG & City of Balch Springs
Evidence of walking was strong even with limited infrastructure, driver safety was a concern
McWhorter Elementary and Floyd Elementary
Dismissal Observations: 5/2021
• NCTCOG, City of Balch Springs, City of Mesquite (McWhorter Only)
- Dismissals cause heavy congestion on Hickory Tree Road at the schools
• Opportunities exist to strengthen pedestrian connections for students to surrounding neighborhoods
===== PAGE 5 =====
Many located in the right-of-way that would need to be relocated
## Bicycle and Pedestrian Safety
• Strong desire to walk and bike but limited infrastructure
## Pass-Through Traffic
• Hickory Tree Road is a parallel route to I-635 and used to avoid difficult nearby intersections
## Access Management
- Maintain access to driveways for homes and businesses, reduce queueing behind drivers waiting for left turns
Hickory Tree Road Planning Study
## NCTCOG's Cross-Section Recommendation
## Three-lane roadway with center turn lane and pedestrian refuge islands at key crossing locations
## Major Considerations:
Access to homes/businesses
Congestion management
Queuing for pick up/drop-off at schools
Bicycle/pedestrian safety and improvements
Pedestrian crossing treatments
## Why:
Improve access to businesses / residences
Improve congestion
Room for bicyclists and pedestrians to travel safely
Improve safety for bicycle/pedestrian
Future traffic volumes
===== PAGE 6 =====
Current Cross-Section:
2-Lanes with limited
Bike/Ped Amenities:
60' ROW
12' Multi-Use Path for
bikes and pedestrians +
buffer space from
roadway
Maintain travel lane
widths and add
pedestrian refuge
island/center turn lane
6' Sidewalk for
pedestrians and
buffer space from
roadway
Recommended Cross-Section:
3-Lane Cross-Section with
Added Ped Refuges:
70' ROW
Hickory Tree Road Planning Study
## Recommendations
Note: exact placement of spot-based recommendations will be explored during the design phase of the project.
## Center Turn Lane:
• Allows for left and right driveway exits
• Vehicles waiting to turn left no longer cause back-ups
• Maximizes access to businesses
## • Pedestrian Refuge Islands
• Increases safety for crossing multi-lane road
• Allows pedestrians to focus on one direction of traffic at a time
• Priority placement locations at schools, parks, etc.
Center Turn Lane: Imagery Courtesy of Google
Pedestrian Refuge Island: Image Courtesy of Dan Burden
===== PAGE 7 =====
• Sidewalks: 5-6', meant for pedestrians
• Shared-use path: >10', shared by bikes and pedestrians
## Crossing Safety Enhancements
- Improve visibility of crosswalks in all weather and lighting conditions
• Concepts for all mid-block crosswalks:
• High visibility crosswalk paint
Crosswalk warning signs
Vehicle stop lines
• Additional lighting
Shared-use Path: Photo Courtesy of Fort Worth
Crossing Safety Enhancements: Photo Courtesy of Dan Sundstrom
### Recommendations (cont.)
## Pedestrian Hybrid Beacon
• Beacon activates to temporarily halt traffic to allow pedestrians to safely cross
• Once pedestrian crosses, road returns to normal conditions
• Possible locations include:
• Schools
• Parks
• Any other areas with safety concerns
===== PAGE 8 =====
Study
Completed
Summer 2022
23
Utilities: FY 24
Construction: FY 25
ROW Acquisition
Meetings with property owners after final roadway design complete
Construction & Utilities
Construction schedule and traffic access discussion to come
North Central Texas Council of Governments BALCH SPRINGS
## CONTACT US
Karla Windsor, AICP
Senior Program Manager
KWeaver@nctcog.org
Shawn Conrad
Principal Transportation
Planner
SConrad@nctcog.org
Chris Dyser
Community Development
Department Director
CDyser@cityofbalchsprings.com
Erin Curry
Transportation Planner
ECurry@nctcog.org
William Freeman
Public Works Director
WFreeman@cityofbalchsprings.com