ACTION ITEM:

Approval of Improvements to Campus Walkways and Miscellaneous Repairs

FACTS:

  • Phase 1 of the Walkways project began in May 2024, focusing on replacing sidewalks and handrails in specific areas.
  • Phase 2 will build upon that work by replacing additional sidewalks, stairs, and handrails that have failed or become unsafe.
  • Construction is scheduled to begin in early 2025.

BUDGETARY IMPLICATIONS:

  • The current budget for this project is $1,000,000.
  • Funding will come from the University's 2024–2026 state bond-funded asset preservation funds, which no longer require a matching contribution.

RECOMMENDATION:

President Koffi C. Akakpo recommends that the Board of Regents approve the Campus Walkways and Miscellaneous Repairs.

MOTION:

Approve the Campus Walkways and Miscellaneous Repairs.