Approval of Improvements to Campus Walkways and Miscellaneous Repairs
Phase 1 of the Walkways project began in May 2024, focusing on replacing sidewalks and handrails in specific areas.
Phase 2 will build upon that work by replacing additional sidewalks, stairs, and handrails that have failed or become unsafe.
Construction is scheduled to begin in early 2025.
The current budget for this project is $1,000,000.
Funding will come from the University's 2024–2026 state bond-funded asset preservation funds, which no longer require a matching contribution.
President Koffi C. Akakpo recommends that the Board of Regents approve the Campus Walkways and Miscellaneous Repairs.
Approve the Campus Walkways and Miscellaneous Repairs.