• Recommendations – Any approval which the Jackson Township Planning Board may grant should be conditioned upon the following being satisfied prior to signing the map:
  • Compliance with all technical revisions and/or corrections previously indicated.
  • Plan revisions required by the denial of any requested variances and/or design waivers.
  • Receipt of approvals and compliance with all permit conditions from any Federal, State, County or local regulatory agencies having jurisdiction over this application.
  • Posting of required performance bond and the payment of required inspection fees.
  • Evidence of comprehensive general liability insurance coverage in accordance with Ordinance requirements.
  • Submission of an agreement from the applicant requesting that the appropriate sections of Title 39 Subtitle 1 be made applicable to this site for police regulation of onsite traffic control devices.
  • Submission of electronic file containing the entire site development.
  • Resolution of any Affordable Housing Obligations which the project may generate.
  • Submission of recorded documents addressing the specific requirements of Ordinance §244-209.J relative to the future maintenance of the project's stormwater management system.
  • Submission of a formal Description of Operations, detailing and outlining all use and operation disclosures as well as any Board imposed limitations and/or restrictions.
  • Compliance with all Standard Conditions as well as any special provisions which the Planning Board may impose.
  • Any sidewalk waiver which the Board may grant will require a contribution to the Township's Pedestrian Safety Fund.

Please be advised that the comments detailed above are based on our initial review of the application. Additional comments and/or plan revisions may be forthcoming subsequent to formal presentation by the applicant and any public comments which is received.

Very truly yours,

Douglas F. Klee, P.E., P.P., C.M.E.

Office of the Planning Board Engineer

DFK:caa:hmh

Attachment – Description of Operations

Cc: L. Morrison, Planning Board Secretary, (lmorrison@jacksontwpnj.net)

  • Shea, Il, Esq., Planning Board Attorney ( bcshea@rcshea.com)
  • Warren, ( pwarren@rcshea.com)
  • Bolinsky, Stormwater Coordinator, ( sbolinsky@jacksontwpnj.net)
  • Fischbach, Recycling Coordinator, (kfischbach@jacksontwpnj.net)
  • Spero, Township Forester ( sspero@cmeusa1.com)
  • Peters, P.E., P.P., C.M.E., Township Planner ( ernie.peters@rve.com)