Block: 21001; Lot: 1 – COJ Holdings, LLC Location: 45 Pitney Lane P/F Major Site Plan for a Change of Use from Residential to House of Worship Engineer: Civil Core Consulting Attorney: Adam Pfeffer, Esq. Date Complete: 5/1/26 Hearing Status: Initial Testimony
Block: 13103; Lots: 4 and 5 – Flair Shteeble, Inc.
Location: 31 and 29 Buckingham Drive
P/F Major Site Plan for a 4,324 Square Foot Shul and Permitted Accessory Structure
Engineer: Haler Consulting
Attorney: Donna Jennings, Esq.
Date Complete: 9/9/26
Hearing Status: Initial Testimony