Pittsburgh Ave. to Indiana Dr.
The first area, shown on these two pages, starts at the Township's eastern boundary at Pittsburgh Avenue. Included in this section is a new signalized intersection at West Erie Plaza and W 8th Street. This new intersection should include high-visibility pedestrian crossings and will be located near an updated bus stop and pull-off.
yard parking. At the time of this report, the infil
Street Trees Medium-sized deciduous trees, 40' on center
Tree Lawn 5' grass
Figure 22: W 8th Street Master Plan - Area 1
Area Key
Concrete Sidewalks
Continuous 5' sidewalk on both sides of the street Crosswalks should be high-visibility crossing motorists of pedestrian