o Site Plan/Concept Plan (drawn to scale), including existing and proposed uses/building/parking and means of ingress/egress/square footage of building
Elevation, rendering of building, signage(during submittal of detail Development Plan)
Narrative Statement
Traffic Impact Analysis: such analysis shall take into consideration the capacity of existing and future streets, projections of the traffic that will be generated by the proposed development, the ability of existing and future streets to accommodate the projected traffic generated by the proposed development, and measures to mitigate high traffic areas and effects. (If applicable)
o Preliminary Drainage Study: a general description of the
stormwater management techniques that will be used to develop the
property. Such study and general description will be provided for
informational purposes only and shall not become part of the PD
ordinance. Detailed drainage plans for stormwater management will
be prepared and approved in accordance with the city's subdivision
regulations. (If applicable)