===== PAGE 1 ===== # INTERSECTION AND ROADWAY IMPROVEMENTS S.R. 40 (Silver Springs Boulevard) from U.S. 441/U.S. 27/U.S. 301 (South Pine Avenue) to NE 25th Avenue
Image
Marion County ## PROJECT DESCRIPTION The Florida Department of Transportation (FDOT) is resurfacing approximately 2.25 miles of Silver Springs Boulevard (State Road (S.R.) 40) from South Pine Avenue (U.S. 441/U.S. 27/U.S. 301) to Northeast 25th Avenue in Ocala. Additionally, turn-lane improvements will be made at the intersection of South Pine Avenue and West Silver Springs Boulevard. The two left-turn lanes on northbound South Pine Avenue to westbound West Silver Springs Boulevard and the right-turn lane on northbound South Pine Avenue to eastbound West Silver Springs Boulevard will be extended to improve traffic flow and reduce congestion. To accommodate the extension of the two left-turn lanes, the midblock crosswalk on South Pine Avenue near Southwest Broadway Street will be removed. This project will also upgrade pedestrian curb ramps as needed in accordance with current Americans with Disabilities Act (ADA) standards. ## WHAT TO EXPECT During construction, motorists can expect nighttime lane closures and detours, along with construction-related noise, dust, and equipment in the area. Electronic message boards and signage will direct traffic through the work zone. FDOT encourages drivers to use caution, remain alert, and follow posted detour signs. Please be aware that construction activity and noise levels may vary during different phases of the project. Motorists should anticipate areas of uneven pavement, a common condition during construction when the contractor applies multiple asphalt layers in phases. These roadway conditions are temporary and will improve as the project progresses. The construction schedule is subject to change due to inclement weather or other unforeseen circumstances. For project updates and lane-closure information, please visit FDOT's Central Florida website at www.cflroads.com. CONTRACTOR Anderson Columbia Co., Inc.
Image
PROJECT COST $5.03 million PROJECT START March 2026 ESTIMATED COMPLETION Fall 2026
Image
FOR QUESTIONS, CONCERNS, OR PROJECT UPDATES Send a request to: Nick Fortuna Community Outreach Specialist 352-620-3005 Nick.Fortuna@dot.state.fl.us SEE REVERSE SIDE FOR ARTIST RENDERINGS
Image
Image
For more information, scan the QR code above or visit the project website at www.cflroads.com/project/ 450952-1
Image
Follow us on social media ===== PAGE 2 ===== # INTERSECTION AND ROADWAY IMPROVEMENTS S.R. 40 (Silver Springs Boulevard) from U.S. 441/U.S. 27/U.S. 301 (South Pine Avenue) to NE 25th Avenue Marion County ## EXISTING CONDITIONS
Image
Existing conditions on the northbound South Pine Avenue approach to the intersection with West Silver Springs Boulevard. ## INTERSECTION IMPROVEMENTS (ARTIST RENDERING)
Image
Artist rendering of the planned improvements on northbound South Pine Avenue with extensions to both the left- and right-turn lanes at the intersection
Image
Follow us on social media