60.1 Technical Proposal

Kentucky State University will evaluate the Vendor's proposal based on the technical portion of the Evaluation Criteria. Each Vendor is responsible for submitting all relevant, factual and correct information with their proposal to enable the evaluator(s) to afford each Vendor the maximum score based on the available data submitted as part of the proposal.

CriteriaMaximum Points Possible
Part 1 – Firm Information50
Part 2 – Personnel and Firm Qualifications100
Part 3 – Relevant Experience100
Part 4 - Investment Strategy and Recommended Asset Allocation300
Part 5 – Reporting Capabilities100
Part 6 - Insurance50
Part 7 – Other Services50
Maximum Points Possible750

Cost Proposal

Kentucky State University will evaluate the Vendor's cost proposal based on the cost portion of the Evaluation Criteria.

The lowest cost firm will receive 250 points; other firms will be assigned points based on this cost formula. The Vendor with the lowest price receives the maximum score. The Vendor with the next lowest price receives points by dividing the lowest price by the next lowest price and multiplying that percentage by the available points. For example, 250 points is allocated to the lowest price criteria for this procurement. Vendor “A” bids $3.00 as the lowest Vendor and receives the maximum 250 points ($3.00 / $3.00 = 1.00 x45 = 45). Assume Vendor “B” is the next lowest Vendor at $4.00, then “B” receives 187.5 points ($3.00 / $4.00 = .75 x 250 = 187.5).

CriteriaMaximum Points Possible
Technical Proposal750
Cost Proposal250
Maximum Points Possible1000