Kentucky State University is exempt from paying sales or use taxes, except on those items and/or purchase transactions that are specifically exempted by law.
Costs for developing the proposals are solely the responsibility of the offerors.
A proposal shall not be considered for award if the price in the proposal was not arrived at independently without collusion, consultation, communication, or agreement as to any matter relating to such prices with any other offeror or with any competitor. In addition, the offeror is prohibited from making multiple proposals in a different form.
Should conflict of interest be detected any time during the contract, the contract shall be null and void and the contractor shall assume all costs of this project until such time that a new contractor is selected.
SECTION 60 – PROPOSAL EVALUATION
60.1 Technical Proposal Evaluation
| Criteria | Maximum Points Possible |
|---|---|
| Transmittal Letter | Mandatory |
| Vendor Certificate of Insurance for General Liability (GL) | Mandatory |
| Vendor Certificate of Insurance for Worker’s Compensation | Mandatory |
| Institutional Experience | 300 |
| Equipment Proposal | 600 |
| Maintenance and Warranty Services | 200 |
| Implementation Plan | 300 |
| Reporting | 200 |
| References | 100 |
| Value Added Services | 100 |
| Maximum Points Possible | 1,800 |
60.2 Cost Proposal Evaluation
| Criteria | Maximum Points Possible |
|---|---|
| Cost for William Exum Center Locations | 400 |
| Cost for Carl M. Hill Student Center Ballroom | 400 |
| Cost for John H. Bradford Hall Locations | 400 |
| Cost for Julian M. Carroll ASB Auditorium | 400 |
| Maximum Points Possible | 1,600 |