        "page": 1,
        "items": [
            {
                "page": 1,
                "type": "TITLE",
                "location": {
                    "l": 180.96,
                    "t": 718.32,
                    "r": 420.96,
                    "b": 669.6
                },
                "text": "KENTUCKY STATE UNIVERSITY\nRFP 24-07 EXTERIOR PAINTING SERVICES\nATTACHMENT C – COST FORM",
                "reading_order": 0,
                "level": 1
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 63.36,
                    "t": 643.68,
                    "r": 409.2,
                    "b": 629.52
                },
                "text": "Vendor Name: ___",
                "reading_order": 1
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 63.12,
                    "t": 606.48,
                    "r": 531.6,
                    "b": 576.24
                },
                "text": "The offeror shall propose amounts required as specified in Scope of Work Section 40.2, necessary to complete the following services:",
                "reading_order": 2
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 68.64,
                    "t": 556.08,
                    "r": 110.4,
                    "b": 542.4
                },
                "text": "Scope:",
                "reading_order": 3
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 68.16,
                    "t": 541.68,
                    "r": 486.72,
                    "b": 527.76
                },
                "text": "o Exterior painting of exterior surfaces of the Academic Services Building",
                "reading_order": 4
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 70.08,
                    "t": 527.04,
                    "r": 481.92,
                    "b": 512.88
                },
                "text": "(All exterior surfaces were pressure washed the week of May 1, 2024)",
                "reading_order": 5
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 67.68,
                    "t": 511.92,
                    "r": 378,
                    "b": 498.72
                },
                "text": "o Repair minor wall cracks, holes, and imperfections",
                "reading_order": 6
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 67.92,
                    "t": 497.76,
                    "r": 375.12,
                    "b": 485.04
                },
                "text": "Thorough cleaning and preparation of all surfaces",
                "reading_order": 7
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 67.44,
                    "t": 483.84,
                    "r": 382.08,
                    "b": 470.64
                },
                "text": "o Two-coat application of high-quality, low-VOC paint",
                "reading_order": 8
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 67.68,
                    "t": 469.2,
                    "r": 363.6,
                    "b": 456
                },
                "text": "o Masking and protection of non-painted surfaces",
                "reading_order": 9
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 67.92,
                    "t": 454.8,
                    "r": 370.8,
                    "b": 441.36
                },
                "text": "o Removal of all paint debris and thorough cleanup",
                "reading_order": 10
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 68.4,
                    "t": 440.4,
                    "r": 582.96,
                    "b": 425.76
                },
                "text": "o Protection of all lawn, landscape and hardscape that may be in the designated work area.",
                "reading_order": 11
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 80.64,
                    "t": 375.6,
                    "r": 357.84,
                    "b": 360.72
                },
                "text": "Total Proposed Cost ___",
                "reading_order": 12
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 80.88,
                    "t": 341.76,
                    "r": 392.4,
                    "b": 326.88
                },
                "text": "Work to be completed by: ___",
                "reading_order": 13
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 279.6,
                    "t": 317.76,
                    "r": 312.48,
                    "b": 303.6
                },
                "text": "Date:",
                "reading_order": 14
            },
            {
                "page": 1,
                "type": "TEXT",
                "location": {
                    "l": 82.08,
                    "t": 277.44,
                    "r": 522.48,
                    "b": 218.88
                },
                "text": "Contractor shall not be penalized for verifiable weather delays. Failure to complete project by quoted date may result in liquidated damages being assessed, at the rate of 1/2% of the total cost, per day after stated substantial completion date. Completion of minor punch list items shall not be counted as additional days.",
                "reading_order": 15
            }
        ]
    }
]