===== PAGE 1 =====
## US 92 (Baker Street) Railroad Crossing Replacement 437819-1-52-01
| Project Details |
| Work Type | Replacement of Railroad Crossing |
| Phase | Design |
| Limits | west of N Michigan Avenue |
| Length | 0.02 miles |
| City | Plant City |
| County | Hillsborough |
| Road | Baker Street US 92 |
| Contact Information |
| Design Manager |
| Lauren Blakeley |
| 813-975-3669 |
| Lauren.Blakeley@dot.state.fl.us |
| Media Contact |
| Kayla Mejia |
| 813-975-6060 |
| Kayla.Mejia@dot.state.fl.us |
Map data ©2026 Google
## About
The purpose of this project is to replace the existing railroad crossing. This project will include repaving US 92 on both sides of the crossing and upgrading pavement markings on the approach to the railroad.
Construction is anticipated to begin in 2027.