• Provide eleven-foot-wide lanes, wider sidewalks, and median islands with landscaping
  • Improved access management
  • Two-way turn lanes at key locations
  • Roundabouts at 17th Avenue W and 12th Avenue W
  • Mid-block crossings
  • Sidewalk network connectivity
  • Traffic calming measures
  • Curb ramp improvements / curb radii reduction
  • Detectable warning additions
  • Pavement marking improvements
  • Signal repairs / pedestrian push button improvements
  • Wayfinding signage
  • Stormwater improvements

3. Completed Work

The scope for the study included development of project Goals and Objectives and Measures of Effectiveness; public outreach; traffic counts and field reviews on the US 41 corridor; traffic analyses; existing conditions analysis; and development of initial strategies to improve multimodal mobility along US 41. The specific tasks completed for the project included:

  • Development of the Goals and Objectives and the Measures of Effectiveness
  • Reviews of previous studies and local comprehensive plans
  • Data collection (for a comprehensive list, see the data collection table later in this summary)
  • Public involvement including:
  • Development of a Communication Plan
  • Presentations and meetings with the Sarasota-Manatee MPO staff and their boards
  • One-on-one stakeholder meetings
  • General public correspondence (no public meetings were held)
  • Traffic analysis including methodology and existing traffic conditions (including a multimodal analysis)
  • Engineering analysis including field reviews, data collection, transit coordination, alternative typical sections development, and access management determination
  • The creation of two primary deliverables:
  • Existing Conditions Report
  • US 41 CMASS Story Map