concrete medians throughout the full segment.No
US 41 from University Pkwy to Cortez RdConduct demonstration project for TSP at US 41 intersections with: • University Blvd. • General Spaatz Blvd. • Tallevast Rd. • Pearl Ave.FPID: 453563-1 TSP Demonstration project for nine intersectionsNo
US 41 from University Pkwy to Cortez RdProvide for queue jumps: • US 41 & Cortez Road - Construct dedicated queue jump • US 41 & Pearl Avenue - Construct additional shared right-turn lane • US 41 & Tallevast Road - Construct additional shared right-turn lane • Pearl Avenue to Tallevast Road - Construct BAT LanePotentially included in TSP Demonstration project aboveYes
US 41 at USF EntranceEvaluate roundaboutN/AYes
US 41 at Braden AveEvaluate roundaboutN/AYes
US 41 at Florida Blvd.• Lighting • High emphasis crosswalk striping • Signal Phasing • Advanced street name signs • Enhancing signal visibilityFPID: 451026-1 Resurfacing from north of Magellan Drive to 63rd AvenueNo
US 41 at SR 70 / 53rd Ave., 49th Ave. Dr. W, Orlando Ave / 46th Ave Dr W, and Cortez Rd / 44th Ave• Install advanced street name signs for US 41 approaches • Update signage • Use protected left-turn phasing instead of permissive or protected-permissive phasing • Add dilemma zone detection for US 41 approaches • Reevaluate clearance interval and pedestrian timings • Crosswalk refurbishment and ADA improvements for all curb ramps and pedestrian push button assembliesSome improvements may be included in the following: • FPID: 449646-1 US 41 Mid-Block Crossings from 53rd Avenue to Cortez Road • FPID: 449646-1 US 41 Sidewalk and Lighting from 53rd Avenue to Cortez RoadYes
US 41 at Cortez Road / 44th Ave• Add supplemental nearside signal heads for all four approaches atN/AYes