Sarasota/Manatee US 41 Corridor Mobility and Safety Study (CMASS) Project Summary
concrete medians throughout the full segment.No
US 41 from University Pkwy to Cortez RdConduct demonstration project for TSP at US 41 intersections with: • University Blvd. • General Spaatz Blvd. • Tallevast Rd. • Pearl Ave.FPID: 453563-1 TSP Demonstration project for nine intersectionsNo
US 41 from University Pkwy to Cortez RdProvide for queue jumps: • US 41 & Cortez Road - Construct dedicated queue jump • US 41 & Pearl Avenue - Construct additional shared right-turn lane • US 41 & Tallevast Road - Construct additional shared right-turn lane • Pearl Avenue to Tallevast Road - Construct BAT LanePotentially included in TSP Demonstration project aboveYes
US 41 at USF EntranceEvaluate roundaboutN/AYes
US 41 at Braden AveEvaluate roundaboutN/AYes
US 41 at Florida Blvd.• Lighting • High emphasis crosswalk striping • Signal Phasing • Advanced street name signs • Enhancing signal visibilityFPID: 451026-1 Resurfacing from north of Magellan Drive to 63rd AvenueNo
US 41 at SR 70 / 53rd Ave., 49th Ave. Dr. W, Orlando Ave / 46th Ave Dr W, and Cortez Rd / 44th Ave• Install advanced street name signs for US 41 approaches • Update signage • Use protected left-turn phasing instead of permissive or protected-permissive phasing • Add dilemma zone detection for US 41 approaches • Reevaluate clearance interval and pedestrian timings • Crosswalk refurbishment and ADA improvements for all curb ramps and pedestrian push button assembliesSome improvements may be included in the following: • FPID: 449646-1 US 41 Mid-Block Crossings from 53rd Avenue to Cortez Road • FPID: 449646-1 US 41 Sidewalk and Lighting from 53rd Avenue to Cortez RoadYes
US 41 at Cortez Road / 44th Ave• Add supplemental nearside signal heads for all four approaches atN/AYes