Sarasota/Manatee US 41 Corridor Mobility and Safety Study (CMASS) Project Summary
○ Leading Pedestrian Intervals (LPI) ○ Crosswalk Visibility Enhancements ○ Raised Crosswalks ○ Pedestrian Crossing/Refuge Islands ○ Pedestrian Hybrid Beacons (PHB) ○ Lane Repurposing
Corridor wideFill bike lane gaps along US 41 in both directionsN/AYes
Corridor wideConstruct planned multi-use trails: Bayshore Treewalk to Sarasota Bay Trail Corridor and University Parkway – Sarasota Bay TrailN/AYes
South end of corridor approximately between University Parkway to Cortez RoadConduct a speed study to evaluate reduction in speed limitN/AYes
US 41 at University Parkway Intersection• Add turn lanes • Add pedestrian crossing on north leg • Improve pedestrian crossing on east leg of intersection • Improve signage • Provide traffic separator in southbound directionFPID: 451011-1 Resurfacing from north of Myrtle Street to Edwards Drive will install a crosswalk on the north leg of this intersection to provide crosswalks across all four legs. Additionally, lighting will be improved at this intersectionYes
US 41 from Edwards Drive to Pearl AvenueLane repurposing from 6 to 4 lanesN/AYes
US 41 from Edwards Drive to 63rd AveRemove TWLTL and replace with raised medianFPID: 444612-1 Resurfacing from Edwards Drive to Magellan Drive\nFPID: 451026-1 Resurfacing from north of Magellan Drive to 63rd Avenue*\n*Approximately half of the TWLTL along this segment are being replaced with raised concrete medians. Due to limited ROW, there is not enough space to installNo