| Field Review | Aug 2023 |
|---|---|
| Traffic Analysis | July - Sept 2023 |
| Finalize Goals & Objectives | May 2023 |
| Finalize Measures of Effectiveness | May 2023 |
| Develop Initial Neighborhood Strategies with input from: Project Working Group Project Advisory Group Sarasota Manatee MPO Staff | May 2023 |
| Refine Strategies Based on Input and share with: Project Working Group Project Advisory Group | Sept - Oct 2023 |
| Develop Existing Conditions Report | Sept - Dec 2023 |
| Develop Story Map | Sept - Dec 2023 |
| Present Final Strategies to Sarasota Manatee MPO Board | Jan 2024 |
Local input was sought throughout the study process to ensure that the needs and desires of the surrounding community were accounted for. The local agency presentations and one-one-one stakeholder meetings are listed in the project timeline included earlier in this summary and detailed in the Sarasota/Manatee US 41 CMASS Summary of Outreach, under separate cover. The primary feedback received from the stakeholder meetings included:
The ArcGIS Story Map created for the US 41 CMASS project was published in February 2024 and is located here: https://storymaps.arcgis.com/stories/a378255a9e7d4120bddaa783a4883efc
The Story Map presents the work completed for the project (including public outreach, the corridor existing conditions, and demographics), and provides a look-ahead to the work that would have been carried out if the