Community Focus Points

Business and local-street access

Traffic diversion onto nearby streets Locations and design of pedestrian crossings

Vehicle speeds and driver behavior

Locations and design of pedestrian crossings

Interest in signal improvements

Utility and design constraints

Safety Solutions Being Evaluated

Improvements for all travel modes

Access and turning-movement changes

Speed-management measures

Safer pedestrian crossings

Intersection and signal improvements

Other proven safety treatments

Potential improvements will be evaluated for safety performance, community effects, engineering feasibility, and cost.

Project Contact & Website

WE WANT TO HEAR FROM YOU!

What do you think are the highest priorities to consider?

  • What works well for you on SR 80?
  • What specific safety concerns do you have (e.g., speeding, crossings, access)?
  • How do you typically travel on this corridor (e.g., driving, walking, biking)?

Please help us make this corridor safer by participating in the project. Share your thoughts directly with our project manager or by visiting the project website.

Project Website

More information on upcoming meetings and opportunities to participate will be shared through the project website in upcoming months.

Natalie Mueller | Project Manager

(863) 519-2837

Natalie.Mueller@dot.state.fl.us

FDOT District 1, 801 N Broadway Ave, Bartow, FL 33830

https://www.swflroads.com/project/447878-2

UPCOMING STEPS

Fall-Winter 2026Complete the safety review and develop potential concepts
January 2027Public workshop and community input
Spring 2027Refine concepts, conduct additional outreach, and identify next steps