Community Focus Points
Business and local-street access
Traffic diversion onto nearby streets Locations and design of pedestrian crossings
Vehicle speeds and driver behavior
Locations and design of pedestrian crossings
Interest in signal improvements
Utility and design constraints
Safety Solutions Being Evaluated
Improvements for all travel modes
Access and turning-movement changes
Speed-management measures
Safer pedestrian crossings
Intersection and signal improvements
Other proven safety treatments
Potential improvements will be evaluated for safety performance, community effects, engineering feasibility, and cost.
Project Contact & Website
WE WANT TO HEAR FROM YOU!
What do you think are the highest priorities to consider?
What works well for you on SR 80?
What specific safety concerns do you have (e.g., speeding, crossings, access)?
How do you typically travel on this corridor (e.g., driving, walking, biking)?
Please help us make this corridor safer by participating in the project. Share your thoughts directly with our project manager or by visiting the project website.
Project Website
More information on upcoming meetings and opportunities to participate will be shared through the project website in upcoming months.
Natalie Mueller | Project Manager
(863) 519-2837
Natalie.Mueller@dot.state.fl.us
FDOT District 1, 801 N Broadway Ave, Bartow, FL 33830
https://www.swflroads.com/project/447878-2
UPCOMING STEPS
Fall-Winter 2026Complete the safety review and develop potential concepts
January 2027Public workshop and community input
Spring 2027Refine concepts, conduct additional outreach, and identify next steps