- Please clarify: the Environmental Impact Statement states the property slopes West to North and the Plans show the property sloping North to South.
- Kindly furnish supporting documentation for your claim of noise at the site.
- Provide supporting documentation for Endangered Species in the area.
- Provide supporting documentation that match the operating hours as indicated during the Planning Board meeting of April 15, 2019.
- Commission Vote: J. Myer, K. Skibo, S. DeMarzo, J. Riker – Ayes
- Block 3001 / Lots 2, 3 & 4 Adventure Crossing PDS Preliminary & Final Major Site Plan - Lots 3 & 4 Two sets of Site Plans, Two (2) Copies of Stormwater Management Report & Two (2) Copies of Environmental Impact Statement. Mr. Cromwell and Ms. Skibo will take the EIS and Stormwater Management Reports for review. PDS will be asked for copies of the site plans. Mr. Cromwell stated that PDS will be sending the plans to the Township Clerk's office. Lonnie Cromwell has the plans. Table to next meeting.
- Block 23103 / Lot 17 Vath Street Morgan Engineering & Surveying Minor Subdivision Subdivide property to create three single family residential lots. One copy of site plan. Lonnie Cromwell has the plans. Table to next meeting.
- Block 10401 / Lots 5.01 & 5.04 & Block 17802 / Lot 57.01 Jackson Park Environmental Impact Statement
(2 Full copies) (6 copies of narrative portion) All members took a copy of the EIS for review. Mr. Riker has the site plans. Mr. Riker noted that this project has two phases. The northern phase is off of Perrineville Road and the southern phase will be off of W. Veterans Highway. No plans have been received. A request will be sent to the Engineer to submit two full size sets of plans for review. (Signed and sealed).
- Block 4201 / Lot 3 Cedar Swamp Road One (1) copy of Preliminary and Final Major Site Plan and One (1) copy of Environmental Impact Statement Matrix Engineering Proposed Self Storage Facility Mr. Riker and Mr. Myer will take plans for review. Mr. Riker and Mr. Myer conducted a site visit at the location and found the area to be a cleared former farm field, there are wet lands as indicated in the rear, no wildlife was observed. The EIS has been received.
- Motion by J. Myer, second by J. Riker to send a Letter of No Concern
- J.Myer, K. Skibo, S. DeMarzo, J. Riker – Ayes
Public - Present this evening are Cameron from Boy Scout Troop 109 and his mother. Mr. Riker explained the functions of the Environmental Commission and discussed some of the projects that the Commission reviews to Cameron and his mother.
New Business Applications
Block 21702 / Lot 32 Block 21801 / Lots 57, 58, 59 & 61 South Hope Chapel Road & Jessica Court
PDS Preliminary and Final Major Subdivision Lonnie Cromwell picked up the plans for this application. Table to the next meeting.
Block 11701 / Lot 9, 25, 26 & 33 Rutherford Estates PDS Amended Final Subdivision (2) Copies Storm Water Report (2) Copies Final Major Subdivision Lonnie Cromwell picked up the plans for this application. Table to the next meeting.
Block 20101 / Lot 30 Sams Road Subdivision Boro Engineering (1) Copy of Site Plan Application Copy of Environmental Impact Statement Kim Skibo and S. DeMarzo will review the plans and report back at the next meeting.